Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

92 Lappin Ave

The City of Toronto has 6 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to basement, first floor and second floor for 2 unit dwelling

    Applied Jan 28, 2026 · issued Feb 13, 2026 · Permit 26 109904 HVA

    Inspections under way
  • Small residential project · Interior alterations

    Proposal for interior alterations to basement, first floor and second floor for 2 unit dwelling

    Applied Jan 28, 2026 · issued Feb 12, 2026 · Permit 26 109904 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to basement, first floor and second floor for 2 unit dwelling

    Applied Jan 28, 2026 · issued Feb 12, 2026 · completed Sep 24, 2026 · Permit 26 109904 PLB

    Closed
  • Drains and site services

    Drain - Proposal for interior alterations to basement, first floor and second floor for 2 unit dwelling

    Applied Jan 28, 2026 · issued Feb 12, 2026 · completed Sep 25, 2026 · Permit 26 109904 DRN

    Closed
  • Plumbing · Unknown

    Install fixtures: 2nd floor 1 single comp l.t. 1st floor: 1 w.c. 1 w.b. 1 b.t. Basemment: 1 l.t. Jnb

    Applied Mar 3, 1998 · issued Mar 10, 1998 · completed May 1, 2026 · Permit 98 013900 PLB

    Closed
  • Small residential project · Unknown

    Make alterations and build addition at front. Also build detached garage at rear. See c of a dec. Bp

    Applied Nov 7, 1997 · issued Dec 4, 1997 · completed May 1, 2026 · 1 home added · Permit 97 023915 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 80 Armstrong Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (two-car garage, abutting the laneway) by constructing a complete second storey addition (cantilevered at the south side of the building), to contain one laneway suite. There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    220 m away · filed Mar 3, 2026 · Approved

  • 172 Emerson Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition (removing the existing attic and dormers). The existing gutter at the third storey level will be maintained and unaltered. Also, to reconstruct the existing rear one-storey addition.

    180 m away · filed Jul 9, 2025 · Approved

  • 107 Lappin Ave · Minor variance

    To permit a portion of the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) from the abutting westerly property, municipally known as 109 Lappin Avenue (as approved under Committee of Adjustment File A0465/24TEY), which encroaches onto this lot. Also, the existing garage height, gable roof, and eaves will be maintained and unaltered.

    70 m away · filed Jun 2, 2025 · Approved

  • 227 Emerson Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the existing one-storey portion of the dwelling).

    160 m away · filed May 1, 2025 · Approved

  • 27 Millicent St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck (green rooftop on second level) and stairs, a complete third storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (containing a garage on the ground level and one laneway suite on the second level), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    230 m away · filed Apr 2, 2025 · Approved

  • 98 Millicent St · Minor variance

    To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).

    100 m away · filed Jan 27, 2025 · Postponed

  • 136 Millicent St · Minor variance

    To construct a new three-storey semi-detached apartment building (multiplex containing six residential dwelling units) with front and rear balconies on the second and third storeys, two rooftop terraces (above the third storey), front and rear entrances on the ground floor, and front and rear basement walkouts.

    140 m away · filed Oct 2, 2024 · Approved

  • 83 Millicent St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with basement extension below, and a rear ground floor deck. The existing ancillary building (detached garage) in the rear yard, abutting the laneway, will be maintained and unaltered.

    150 m away · filed Jun 22, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.