Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

98 Brooklyn Ave

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Rear 1-storey addition - kitchen extension/ mudroom/powder room; new bathroom in basement

    Applied Mar 30, 2007 · issued Mar 30, 2007 · Permit 07 132396 BLD

    Inspections under way
  • Small residential project · Multiple projects

    Further scope of underpinning. Lower and underpinning existing foundation wall and pour new basement slab.

    Applied Mar 23, 2007 · issued Apr 12, 2007 · Permit 02 165278 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - 2 floor drains; roughin 1 bath, 1wc, 1 sink,for new bathroom; 1 washing machine connection and 1 loundary sink.

    Applied Aug 20, 2002 · issued Aug 20, 2002 · Permit 02 165278 PLB

    Permit issued
  • Small residential project · Multiple projects

    Lower and underpinning existing foundation wall and pour new basement slab.

    Applied Aug 20, 2002 · issued Aug 20, 2002 · Permit 02 165278 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    160 m away · filed Aug 21, 2026 · Postponed

  • 12 Audley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    130 m away · filed Jun 17, 2026 · Approved

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    60 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    160 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    240 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    160 m away · filed Jun 5, 2025 · Approved

  • 75 Badgerow Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.

    230 m away · filed May 27, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    110 m away · filed Apr 22, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.