Toronto address · Ward 3, Etobicoke-Lakeshore
98 Dunedin Dr
The City of Toronto has 3 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for a rear two-storey addition to an existing detached single family dwelling on a reduced lot. The lot of record at 98 Dunedin is consisted of a Part Lot 13 Plan 2906, and a vacant lot (Block A Plan 3209). This existing two-storey detached SFD is located entirely on Part Lot 19 Plan 2906.
Applied Jun 30, 2021 · issued Jul 5, 2021 · completed Dec 21, 2021 · Permit 21 116563 HVA
- Closed
Plumbing
Plumbing - Proposal for a rear two storey addition to an existing detached single family dwelling.
Applied Feb 16, 2021 · issued Jun 28, 2021 · completed Dec 21, 2021 · Permit 21 116563 PLB
- Closed
Small residential project · Addition(s)
Proposal for a rear two-storey addition to an existing detached single family dwelling on a reduced lot. The lot of record at 98 Dunedin is consisted of a Part Lot 13 Plan 2906, and a vacant lot (Block A Plan 3209). This existing two-storey detached SFD is located entirely on Part Lot 19 Plan 2906.
Applied Feb 16, 2021 · issued Jun 28, 2021 · completed Dec 21, 2021 · Permit 21 116563 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To maintain the existing dwelling.
Decision: Approved (hearing Sep 15, 2022)
Filed Jun 2, 2022 · File A0317/22EYK
- Closed
Consent · Lot addition
To obtain consent to sever the lot for the purpose of a lot addition
Decision: Approved (hearing Sep 15, 2022)
Filed Apr 28, 2022 · File B0020/22EYK
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 274 homes · Mixed use
180 m away · Site plan · Under appeal · filed Oct 10, 2023
- Under review
4208-4214 Dundas Street West and 10-20 Brin Drive
Not stated in the file
270 m away · Site plan · Under review · filed Jun 21, 2021
- Under review
Not stated in the file
380 m away · Condominium · Under review · filed Aug 5, 2026
- Submitted
14 storeys · 120 homes · Residential
400 m away · Site plan · Submitted · filed Jul 3, 2026
- Under review
8 storeys · Mixed use
440 m away · Site plan · Under review · filed Jun 10, 2022
Neighbours’ Committee of Adjustment files within 250 m
13 Shand Ave · Consent
To obtain consent to sever the lot for the purpose of a lot addition.
190 m away · filed Jul 21, 2026 · Accepted
510 Prince Edward Dr N · Minor variance
To construct a two-storey front addition that will include a new attached garage and a two-storey rear addition. A previous Committee of Adjustment Decision (A0604/21EYK) approved variances relating to front and side yard setbacks, platform and canopy encroachment, and driveway positioning.
190 m away · filed Nov 28, 2025 · Approved
134 Strath Ave · Minor variance
To maintain the existing rear yard deck.
60 m away · filed Jun 9, 2025 · Approved
96 Dunedin Dr · Minor variance
To construct a new detached dwelling with an attached garage.
10 m away · filed Mar 12, 2025 · Approved
97 Dunedin Dr · Minor variance
To construct a new attached garage along the north side of the dwelling, and a partial second storey addition.
40 m away · filed Oct 31, 2023 · Approved
96 Dunedin Dr · Minor variance
To construct a new multiplex dwelling with an attached garage.
10 m away · filed Sep 22, 2023 · Approved
99 Government Rd · Minor variance
To construct a new detached dwelling with an attached garage and a ancillary structure (pool house) in the rear yard.
100 m away · filed Jul 23, 2023 · Approved
134 Government Rd · Minor variance
To convert a portion of the third storey attic into livable space.
150 m away · filed Oct 17, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.