Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

100 Front St W

The City of Toronto has 107 building permits since 2017 (42 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 02: adding new gypsum ceilings, revision of sprinkler layouts, addition of lighting, and the associated HVAC and electrical updates.HVAC - Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Sep 21, 2026 · Permit 26 124716 HVA (revision 02)

    Under review
  • Addition or alteration · Interior alterations

    Revision 02: adding new gypsum ceilings, revision of sprinkler layouts, addition of lighting, and the associated HVAC and electrical updates.Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Sep 21, 2026 · Permit 26 124716 BLD (revision 02)

    Not started
  • Plumbing · Other

    Proposal for east retail equipment upgrades

    Applied Sep 16, 2026 · Permit 26 238480 PSA

    Application acceptable
  • Heating and ventilation · Other

    Proposal for east retail equipment upgrades

    Applied Sep 16, 2026 · Permit 26 238475 MSA

    Not started
  • Addition or alteration · Interior alterations

    Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Sep 2, 2026 · Permit 26 231580 BLD

    Under review
  • Heating and ventilation

    HVAC - Proposed tenant fit out for clothing store

    Applied Aug 24, 2026 · issued Sep 22, 2026 · Permit 26 224799 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed tenant fit out for clothing store

    Applied Aug 24, 2026 · issued Sep 21, 2026 · Permit 26 224799 BLD

    Permit issued
  • Addition or alteration · Multiple projects

    Proposal for new coffee shop on Lobby Level. New interior paritions, ceiling and flooring. New cafe bar top and banquette seating areas.

    Applied Aug 21, 2026 · Permit 26 223895 BLD

    Not started
  • Plumbing

    Plumbing - Proposal for new coffee shop on Lobby Level. New interior paritions, ceiling and flooring. New cafe bar top and banquette seating areas.

    Applied Aug 21, 2026 · Permit 26 223895 PLB

    Not started
  • Heating and ventilation

    HVAC - Proposal for new coffee shop on Lobby Level. New interior paritions, ceiling and flooring. New cafe bar top and banquette seating areas.

    Applied Aug 21, 2026 · Permit 26 223895 HVA

    Not started
  • Temporary structure · Temporary structures

    Erect temporary tent and truss structure for tiff red carpet event.

    Applied Jul 22, 2026 · issued Aug 20, 2026 · Permit 26 206502 TPS

    Permit issued
  • Heating and ventilation

    Rev 01 - Proposed amendment to capture fire damper scope in washroom for Level 2, Room 2-291.HVAC - Proposal for interior alterations to hotel.

    Applied Jun 21, 2026 · issued Jul 9, 2026 · Permit 26 125175 HVA (revision 01)

    Revision issued
Show 95 more permits
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Apr 16, 2026 · completed Sep 1, 2026 · Permit 26 124716 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to hotel.

    Applied Mar 5, 2026 · issued Apr 15, 2026 · Permit 26 125175 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to hotel.

    Applied Mar 5, 2026 · issued Apr 15, 2026 · Permit 26 125175 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to hotel.

    Applied Mar 5, 2026 · issued Apr 15, 2026 · completed Sep 23, 2026 · Permit 26 125175 PLB

    Closed
  • Addition or alteration · Interior alterations

    Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Mar 4, 2026 · issued Apr 20, 2026 · Permit 26 124716 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Mar 4, 2026 · issued Apr 20, 2026 · Permit 26 124716 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior renovation of the retail corridor off of the east entrance at the lobby level.

    Applied Mar 4, 2026 · issued Apr 20, 2026 · Permit 26 124716 PLB

    Inspections under way
  • Heating and ventilation · Other

    Proposal for end-of-life like-for-like capacity replacement of pool ventilation and dehumidification unit. Conversion from air-cooled to water-cooled. Heating source remains hydronic.

    Applied Nov 18, 2025 · issued Dec 18, 2025 · Permit 25 255566 MSA

    Permit issued
  • Temporary structure · Temporary structures

    Proposal to erect 1 temporary structure for TIFF at the Toral York Hotel from Sep 6, 2025 to Sep 8, 2025

    Applied Jul 31, 2025 · issued Aug 18, 2025 · completed Sep 25, 2025 · Permit 25 203118 TPS

    Closed
  • Plumbing

    Plumbing Revision 01 - Revised Gas schematics and plumbing venting. Revised floor drains. Revised HVAC supply and ducting layouts. ----------------------------------------------------------------------------Plumbing - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Feb 20, 2025 · issued Mar 27, 2025 · completed Mar 2, 2026 · Permit 23 177925 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC Revision 03 - Revised Gas schematics and plumbing venting. Revised floor drains. Revised HVAC supply and ducting layouts. ----------------------------------------------------------------------Revision 02 - Change to Control Valve schedule which removes all previously noted supervisory valves.----------------------------------------------------------------------REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.HVAC - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for…

    Applied Feb 20, 2025 · issued Mar 27, 2025 · Permit 23 177925 HVA (revision 03)

    Revision issued
  • Heating and ventilation

    Revision 02 - Change to Control Valve schedule which removes all previously noted supervisory valves.----------------------------------------------------------------------REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.HVAC - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Sep 27, 2024 · issued Nov 12, 2024 · Permit 23 177925 HVA (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposed rehabilitation of the Royal York Hotel's Steam Tunnel along York Street, the west side of the building. Work includes replacement of service tunnel wall, repair to concrete encasement of steel members, and other incidental work.

    Applied Sep 16, 2024 · issued Nov 12, 2024 · Permit 24 213658 BLD

    Permit issued
  • Temporary structure · Temporary structures

    Installation of temporary truss structure to support banner and for TIFF red carpet event. Sept 8/2024

    Applied Aug 13, 2024 · issued Aug 26, 2024 · completed Sep 12, 2024 · Permit 24 197105 TPS

    Closed
  • Addition or alteration · Interior alterations

    REV 02: Layout changes as per the drawingsREV 01: Proposal for an interior fit out for a new fitness centre / gym for hotel guests. Revision scope incl. new partitions, new floorings, new ceilings, new HVAC, new plumbing & new electrical.Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level); Demolition work only. (Occupancy permit to follow at a later date.)

    Applied Jul 5, 2024 · issued Aug 26, 2024 · completed Oct 9, 2024 · Permit 22 177602 BLD (revision 02)

    Closed
  • Heating and ventilation

    REVISION 2 - Layout changes as per the drawingsHVAC - Proposal for interior alterations to demolish partitions and finishes in an existing hotel - LEVEL H

    Applied Jul 5, 2024 · issued Sep 19, 2024 · completed Nov 4, 2024 · Permit 22 177602 HVA (revision 02)

    Closed
  • Plumbing

    REVISION 2 - Layout changes as per the drawingsPlumbing - Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level). Demolition only. Occupancy permit to follow at a later date.

    Applied Jul 5, 2024 · issued Sep 19, 2024 · completed Sep 26, 2024 · Permit 22 177602 PLB (revision 02)

    Closed
  • Plumbing

    Plumbing - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Jun 11, 2024 · issued Jul 9, 2024 · completed Mar 2, 2026 · Permit 23 177925 PLB

    Closed
  • Alternative solution

    Proposal for an Alternate Solution for an alternate cooling method for natural gas generators in the basement.

    Applied Jun 11, 2024 · completed Aug 7, 2024 · Permit 24 163050 ALT

    Approved
  • Addition or alteration · Multiple projects

    REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Jun 11, 2024 · issued Jul 29, 2024 · Permit 23 177925 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.HVAC - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Jun 11, 2024 · issued Aug 21, 2024 · Permit 23 177925 HVA (revision 01)

    Revision issued
  • Plumbing

    REV01: Proposed revision as per drawings Plumbing - Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level). Demolition only. Occupancy permit to follow at a later date.

    Applied Dec 21, 2023 · issued Jan 31, 2024 · completed Sep 26, 2024 · Permit 22 177602 PLB (revision 01)

    Closed
  • Temporary structure · Temporary structures

    Installation of temporary truss structure to support banner for tiff redcarpet eventsep 10 2023 only

    Applied Sep 6, 2023 · issued Sep 7, 2023 · Permit 23 198622 TPS

    Permit issued
  • Heating and ventilation

    HVAC - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Jul 21, 2023 · issued Nov 7, 2023 · Permit 23 177925 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged to accommodate new mechanical equipment.

    Applied Jul 21, 2023 · issued Nov 7, 2023 · Permit 23 177925 BLD

    Inspections under way
  • Heating and ventilation · HVAC: groups A & B

    Replacement of one existing ventilation supply air unit that is at the end of functional life. Like for like capacity and function.

    Applied Jul 20, 2023 · issued Aug 8, 2023 · Permit 23 177346 MSA

    Permit issued
  • Addition or alteration · Interior alterations

    REV 01: Proposal for an interior fit out for a new fitness centre / gym for hotel guests. Revision scope incl. new partitions, new floorings, new ceilings, new HVAC, new plumbing & new electrical.Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level); Demolition work only. (Occupancy permit to follow at a later date.)

    Applied Jun 28, 2023 · issued Oct 17, 2023 · completed Oct 9, 2024 · Permit 22 177602 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01: Interior fit out for future fitness/gym for Hotel. The submitted drawings indicate New Partitions, new floorings, new ceilings, new HVAC, new Plumbing and new Electrical. HVAC - Proposal for interior alterations to demolish partitions and finishes in an existing hotel - LEVEL H

    Applied Jun 28, 2023 · issued Jul 28, 2023 · completed Nov 4, 2024 · Permit 22 177602 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level). Demolition only. Occupancy permit to follow at a later date.

    Applied Jun 22, 2023 · issued Nov 28, 2023 · completed Sep 26, 2024 · Permit 22 177602 PLB

    Closed
  • Plumbing · Other

    Demolition of existing MEP work and installation of modern new replacment MEP for better energy efficiency.

    Applied May 15, 2023 · issued Jul 4, 2023 · Permit 23 146081 PSA

    Inspections under way
  • Heating and ventilation · Other

    Demolition of existing MEP work and installation of modern new replacment MEP for better energy efficiency.

    Applied Nov 7, 2022 · issued Dec 7, 2022 · Permit 22 226903 MSA

    Inspections under way
  • Heating and ventilation · Other

    Proposal to add new heat pumps to the building. Heat pumps will recover energy from the Enwave chilled water loop. Add back up enwave cooling heat exchangers. Add back up steam heat exchangers for heating and domestic hot water production. The scope only covers the central utility plant. No demolition of existing heating and cooling systems is included in mechanical scope at this time - Royal York Hotel

    Applied Sep 26, 2022 · issued Oct 31, 2022 · completed Feb 12, 2024 · Permit 22 208654 MSA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to demolish the existing fuel oil systems & storage rooms located at the sub-basement level for expansion of the mechanical room areas for storage tanks, valve controls, pumps & future generators. No exterior work. Demolition work restricted to one floor only. [Fairmont Royal York hotel]

    Applied Jul 29, 2022 · issued Sep 26, 2022 · Permit 22 184062 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Fuel oil systems and storage room demolition

    Applied Jul 29, 2022 · issued Sep 26, 2022 · Permit 22 184062 HVA

    Permit issued
  • Addition or alteration · Other

    Replacing the fire pumps, reworking the fire protection headers in the basement, modifying the fire alarm to suit, and replacing the entering water meter and backflow preventer assembly.

    Applied Jul 25, 2022 · issued Aug 25, 2022 · Permit 22 181710 BLD

    Permit issued
  • Plumbing

    Plumbing - Replacing the fire pumps, reworking the fire protection headers in the basement, modifying the fire alarm to suit, and replacing the entering water meter and backflow preventer assembly.

    Applied Jul 25, 2022 · issued Aug 25, 2022 · completed Mar 22, 2024 · Permit 22 181710 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to demolish partitions and finishes in an existing hotel - LEVEL H

    Applied Jul 15, 2022 · issued Aug 17, 2022 · completed Nov 4, 2024 · Permit 22 177602 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to demolish non-load bearing interior partitions and finishes in the existing Fairmont Royal York hotel. No exterior work. Demolition work restricted to one floor only (H-Level); Demolition work only. (Occupancy permit to follow at a later date.)

    Applied Jul 15, 2022 · issued Aug 17, 2022 · completed Oct 9, 2024 · Permit 22 177602 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    Revision 01: to address changes as a result of a variance submitted to an accepted by the TSSA to allow existing sprinkler flow switches to initiate elevator recall in lieu of providing new smoke detectors on various floors.

    Applied Jun 23, 2021 · issued Jul 23, 2021 · completed Nov 3, 2021 · Permit 20 233296 FSU (revision 01)

    Closed
  • Fire and security upgrade · Fire alarm

    Partial fire alarm upgrade at interconnections with elevator upgrade

    Applied Dec 22, 2020 · issued Jan 21, 2021 · completed Nov 3, 2021 · Permit 20 233296 FSU

    Closed
  • Addition or alteration · Interior alterations

    Revision 01 - to remove permit scope of work from the first floor - no other changesProposal to construct interior alterations to 1st and 12th floor of exisiting hotel.

    Applied Oct 26, 2020 · issued Nov 20, 2020 · completed Nov 25, 2020 · Permit 18 207520 BLD (revision 01)

    Closed
  • Temporary structure · Certified tents

    Proposal for installation of temporary tent 30' x 40' Legacy Tents for Maple Leaf Sports - Tent certificate number 14-219348

    Applied Jul 21, 2020 · issued Jul 31, 2020 · completed Jul 23, 2025 · Permit 20 170332 TPS

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior renovations including demolition, new partitions. Renovation to existing washrooms located on lobby level. renovated bar + seating area. New sink at bar counter.

    Applied Dec 10, 2019 · issued Jan 30, 2020 · completed Aug 31, 2020 · Permit 19 259342 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior renovations including demolition, new partitions. Renovation to existing washrooms located on lobby level. renovated bar + seating area. New sink at bar counter.

    Applied Dec 10, 2019 · issued Jan 28, 2020 · completed Nov 10, 2020 · Permit 19 259342 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior renovations including demolition, new partitions. Renovation to existing washrooms located on lobby level. renovated bar + seating area. New sink at bar counter.

    Applied Dec 10, 2019 · issued Feb 5, 2020 · completed Dec 10, 2020 · Permit 19 259342 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to floor level A for new retail store.

    Applied Aug 9, 2019 · issued Sep 10, 2019 · completed Oct 9, 2019 · Permit 19 203380 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to floor level A for new retail store.

    Applied Aug 9, 2019 · issued Sep 11, 2019 · completed Oct 1, 2019 · Permit 19 203380 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to floor level A for new retail store.

    Applied Aug 9, 2019 · completed Sep 11, 2019 · Permit 19 203380 PLB

    Cancelled
  • Heating and ventilation

    HVAC - Proposed concrete repair and mechanical alterations to an existing hydro-vault for an existing hotel.

    Applied Jun 6, 2019 · issued Jul 31, 2019 · completed Jul 2, 2020 · Permit 19 166807 HVA

    Closed
  • Plumbing

    Plumbing - Proposed concrete repair and mechanical alterations to an existing hydro-vault for an existing hotel.

    Applied Jun 6, 2019 · issued Jul 31, 2019 · completed Sep 29, 2020 · Permit 19 166807 PLB

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Proposed concrete repair and mechanical alterations to an existing hydro-vault for an existing hotel.

    Applied Jun 6, 2019 · issued Jul 31, 2019 · completed Oct 2, 2020 · Permit 19 166807 BLD

    Closed
  • Plumbing

    Revision 03 - Addition changes regarding washroom layout in the restaurantRevision 02 - Changing the layout of washrooms in restaurant. REVISION - increase the area of workPlumbing - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied May 22, 2019 · issued Jun 28, 2019 · completed Apr 1, 2022 · Permit 17 274146 PLB (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Rev 02 - Changing the layout of washrooms in restaurant. REVISION - increase the area of workProposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied Mar 29, 2019 · issued Jun 6, 2019 · Permit 17 274146 BLD (revision 02)

    Revision issued
  • Plumbing

    Revision 02 - Changing the layout of washrooms in restaurant. REVISION - increase the area of workPlumbing - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied Mar 29, 2019 · issued May 6, 2019 · completed Apr 1, 2022 · Permit 17 274146 PLB (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations on the 2nd and 3rd floor of existing hotel. renovation includes new partitions + doors and 1 new universal washroom on MM Level - "Fairmont royal York"

    Applied Sep 21, 2018 · issued Jan 8, 2019 · completed Sep 18, 2020 · Permit 18 229666 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations to 1st and 12th floor of exisiting hotel.

    Applied Aug 10, 2018 · issued Dec 13, 2018 · completed Nov 25, 2020 · Permit 18 207520 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to 1st and 12th floor of exisiting hotel.

    Applied Aug 10, 2018 · issued Dec 13, 2018 · completed Sep 22, 2020 · Permit 18 207520 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alterations to 1st and 12th floor of exisiting hotel.

    Applied Aug 10, 2018 · issued Dec 13, 2018 · completed Sep 4, 2019 · Permit 18 207520 PLB

    Closed
  • Plumbing

    REVISION - increase the area of workPlumbing - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied May 18, 2018 · issued Jun 21, 2018 · completed Apr 1, 2022 · Permit 17 274146 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REVISION - increase the area of workProposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied May 18, 2018 · issued Jun 22, 2018 · Permit 17 274146 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REVISION - increase the area of workHVAC - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied May 18, 2018 · issued Jun 21, 2018 · completed Nov 17, 2021 · Permit 17 274146 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision to relocate a door and revision to fire rated wall.

    Applied May 15, 2018 · issued Dec 17, 2018 · completed Sep 22, 2020 · Permit 17 262693 HVA (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision to add 2 new fireplaces to Gold Lounge on 18th floor.

    Applied Apr 24, 2018 · issued May 25, 2018 · completed Dec 3, 2020 · Permit 17 262693 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision to add 2 new fireplaces to Gold Lounge on 18th floor.

    Applied Apr 24, 2018 · issued May 2, 2018 · completed Sep 22, 2020 · Permit 17 262693 HVA (revision 01)

    Closed
  • Fire and security upgrade · Sprinklers

    Proposed sprinklers in relation to permit 17-247415.

    Applied Apr 5, 2018 · issued May 11, 2018 · completed Dec 21, 2020 · Permit 18 138963 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied Dec 11, 2017 · issued Mar 7, 2018 · Permit 17 274146 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied Dec 11, 2017 · issued Mar 21, 2018 · completed Nov 17, 2021 · Permit 17 274146 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to lobby floor, new floors, ceilings, interior partitions and demotion of existing decorative stair in existing *Royal York Hotel*.

    Applied Dec 11, 2017 · issued Mar 7, 2018 · completed Apr 1, 2022 · Permit 17 274146 PLB

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the 18th floor guest suites in existing hotel "Royal York Hotel"

    Applied Nov 15, 2017 · issued Dec 14, 2017 · completed Feb 22, 2019 · Permit 17 262693 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the Gold Floor Lounge at 18th floor in existing hotel "Royal York Hotel"

    Applied Nov 15, 2017 · issued Dec 14, 2017 · completed Dec 3, 2020 · Permit 17 262693 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 18th floor guest suites in existing hotel "Royal York Hotel"

    Applied Nov 15, 2017 · issued Dec 14, 2017 · completed Sep 22, 2020 · Permit 17 262693 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to guest suites located at part of 12 th floor (North Wing) and all suites on the 13th 14th 15th 16th. & 17th. Floors - Part of 18th. Floor (North Wing). "Royal York Hotel"

    Applied Oct 13, 2017 · issued Dec 12, 2017 · completed Nov 25, 2020 · Permit 17 247415 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to guest suites located at part of 12 th floor (North Wing) and all suites on the 13th 14th 15th 16th. & 17th. Floors - Part of 18th. Floor (North Wing). "Royal York Hotel"

    Applied Oct 13, 2017 · issued Dec 12, 2017 · completed Nov 17, 2020 · Permit 17 247415 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to guest suites located at part of 12 th floor (North Wing) and all suites on the 13th 14th 15th 16th. & 17th. Floors - Part of 18th. Floor (North Wing). "Royal York Hotel"

    Applied Oct 13, 2017 · issued Dec 12, 2017 · completed Nov 24, 2020 · Permit 17 247415 HVA

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the concourse level - back to base build - in existing hotel "Royal York"

    Applied Oct 6, 2017 · issued Apr 18, 2018 · completed Sep 29, 2020 · Permit 17 244417 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the concourse level - back to base build - in existing hotel "Royal York"

    Applied Oct 6, 2017 · issued Jan 23, 2018 · completed May 9, 2018 · Permit 17 244417 BLD

    Closed
  • Fire and security upgrade · Sprinklers

    Modify existing sprinkler system for model suites on 15th floor

    Applied Aug 8, 2017 · issued Sep 7, 2017 · Permit 17 212884 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal to construct 2 mock-up suites on the 15th floor plus adjacent corresponding 3 bays' corridors.

    Applied Mar 31, 2017 · issued Apr 18, 2017 · Permit 17 137218 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct 2 mock-up suites on the 15th floor plus adjacent corresponding 3 bays' corridors.

    Applied Mar 31, 2017 · issued Apr 27, 2017 · completed Jul 2, 2025 · Permit 17 137218 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct 2 mock-up suites on the 15th floor plus adjacent corresponding 3 bays' corridors.

    Applied Mar 31, 2017 · issued Apr 27, 2017 · Permit 17 137218 HVA

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Modify sprinkkler system in new pantry rooms on levels 3 and 4 from NFPA 13 R to light hazard occupancy, by adding sprinklers in the bathroom and closet

    Applied Nov 17, 2016 · issued Dec 29, 2016 · completed Jan 25, 2017 · Permit 16 252409 FSU

    Closed
  • Heating and ventilation

    REVISION - interior alterations to level 5, including relocation of access door and corresponding sprinklersHVAC - Applicant proposed to the convert a suit on both the 4th and 5th Floor of the existing building into a Pantry. Addition of an Access Control Door at both 4th and 5th Floors corridors

    Applied Oct 17, 2016 · issued Nov 14, 2016 · completed Mar 27, 2017 · Permit 16 193486 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REVISION - interior alterations to level 5, including relocation of access door and corresponding sprinklersApplicant proposed to the convert a suit on both the 4th and 5th Floor of the existing building into a Pantry. Addition of an Access Control Door at both 4th and 5th Floors corridors

    Applied Oct 17, 2016 · issued Oct 19, 2016 · completed Apr 7, 2017 · Permit 16 193486 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to turn suties on the 4th floor into a lounge area and alterations to the 5th floor lobby

    Applied Jul 28, 2016 · issued Sep 9, 2016 · completed Apr 20, 2017 · Permit 16 198441 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal to turn suties on the 4th floor into a lounge area and alterations to the 5th floor lobby

    Applied Jul 28, 2016 · issued Sep 9, 2016 · completed Apr 21, 2017 · Permit 16 198441 BLD

    Closed
  • Heating and ventilation

    HVAC - Applicant proposed to the convert a suit on both the 4th and 5th Floor of the existing building into a Pantry. Addition of an Access Control Door at both 4th and 5th Floors corridors

    Applied Jul 19, 2016 · issued Aug 5, 2016 · completed Mar 27, 2017 · Permit 16 193486 HVA

    Closed
  • Plumbing

    Plumbing - Applicant proposed to the convert a suit on both the 4th and 5th Floor of the existing building into a Pantry. Addition of an Access Control Door at both 4th and 5th Floors corridors

    Applied Jul 19, 2016 · issued Aug 5, 2016 · completed Mar 20, 2017 · Permit 16 193486 PLB

    Closed
  • Addition or alteration · Interior alterations

    Applicant proposed to the convert a suit on both the 4th and 5th Floor of the existing building into a Pantry. Addition of an Access Control Door at both 4th and 5th Floors corridors

    Applied Jul 19, 2016 · issued Jul 25, 2016 · completed Apr 7, 2017 · Permit 16 193486 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the existing commercial retail unit on the level below ground of the existing hotel to create two new units by providing a new demising wall "Royal York Hotel"

    Applied Apr 26, 2016 · issued May 27, 2016 · completed Mar 16, 2017 · Permit 16 146068 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the commercial retail unit on the ground floor of the existing hotel "Royal York Hotel"

    Applied Apr 26, 2016 · issued May 27, 2016 · completed Mar 9, 2017 · Permit 16 146068 HVA

    Closed
  • Addition or alteration · Interior alterations

    Permit for interior alterations to part of Floor "D".

    Applied Mar 31, 2016 · issued Apr 11, 2016 · completed Jan 4, 2017 · Permit 16 133956 BLD

    Closed
  • Heating and ventilation · Other

    Replace existing fan coil grilles. Cleaning fan coils. Install 2 new air transfer fans complete with new grilles*Toronto cosmetic surgery institute*

    Applied Feb 26, 2016 · issued Apr 4, 2016 · completed Jan 9, 2017 · Permit 16 121324 MSA

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal to replace old sprinkler system with new system in existing hotel - "Royal York Hotel"

    Applied Apr 10, 2015 · issued Apr 28, 2015 · Permit 15 139281 FSU

    Permit issued
  • Addition or alteration · Shoring

    Proposal for a new underground connection to the PATH system under York St from the sub-basement level of the Royal York Hotel. The construction will be the first phase of a more extensive renovation within the Hotel which will provide a pedestrian link from the NW PATH to the existing PATH network at the east end of the Hotel at the Royal Bank Plaza. This will provide a weather-protected pathway from the west end of Union Station and Metrolink to the east PATH network.

    Applied Nov 21, 2014 · issued Dec 5, 2014 · Permit 14 255233 BLD

    Permit issued
  • Fire and security upgrade · Sprinklers

    Proposal to remove old plastic sprinkler pipes and replace with new steel pipes on floors 1, 2, 9, & 10 in existing hotel - "Royal York Hotel"

    Applied Aug 11, 2014 · issued Sep 11, 2014 · Permit 14 204101 FSU

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 121 King St W · Minor variance

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    220 m away · filed May 19, 2026 · Approved

  • 156 Front St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.

    240 m away · filed Nov 4, 2024 · Approved

  • 71 Front St W · Minor variance

    To alter the existing Union Station (railway station) by constructing a new South Platform, Tracks Q and R, Concourse Extension from York Street to Bay Street, and Single Canopy Structure.

    110 m away · filed Dec 12, 2022 · Approved

  • 95 Wellington St W · Minor variance

    To alter the Site-Specific By-law for the 22-storey mixed use building by constructing new vestibule entrances, expanding the retail component on the ground floor, and by constructing a new canopy along the Wellington Street West frontage.

    70 m away · filed Jun 16, 2020 · Approved

  • 200 Bay St · Minor variance

    To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.

    140 m away · filed Feb 5, 2020 · Application withdrawn

  • 40 University Ave · Minor variance

    To alter the existing mixed-use 14-storey building by reducing the number of parking spaces by one.

    230 m away · filed Jan 9, 2020 · Withdrawn

  • 40 University Ave · Minor variance

    To alter the existing 13-storey mixed-use building containing ground floor retail and 21 parking spaces by constructing an addition to the ground floor of the north, east, and south side. The ground floor commercial area will be expanded by enclosing the portion of the ground floor which is currently inset from the exterior main wall.

    230 m away · filed Jan 19, 2018 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.