The City of Toronto has 42 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Electromagnetic locks

    Proposal for one maglock on level 34.

    Applied Jul 4, 2025 · issued Jul 9, 2025 · Permit 25 188089 FSU

    Inspections under way
  • Alternative solution

    ALTERNATIVE SOLUTION RELATED TO 18 236859 - Level 1 exit through a lobby condition. It isproposed to have occupancy, consisting of limited fixtures/furnishings, two desks and artwork located within the exit lobby of the building. Evaluation Work sheet prepared by LRI and included for review and approval.

    Applied Jul 4, 2023 · completed Sep 26, 2023 · Permit 23 169627 ALT

    Approved
  • Heating and ventilation

    REVISION 4 - 0 Hour Ceiling and Exit Thru Lobby as illustrated on mechanical drawing and Code Consultant Report HVAC - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Nov 4, 2022 · issued Dec 9, 2022 · completed Dec 24, 2024 · Permit 18 236859 HVA (revision 04)

    Closed
  • New building

    Rev 3: HERITAGE COLUMN FIREPROOFING Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Sep 8, 2022 · issued Sep 22, 2022 · completed Jan 23, 2025 · Permit 18 236859 BLD (revision 03)

    Closed
  • Heating and ventilation

    Rev 3: REVISION TO DBZ ZONES ON LEVEL 1MHVAC - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Sep 8, 2022 · issued Sep 26, 2022 · completed Dec 24, 2024 · Permit 18 236859 HVA (revision 03)

    Closed
  • Alternative solution

    Alternative solution proposal to construct a vertical duct space extending from level 1M to Level 21 with a 2 h fire-resistance rating with the bottom of the duct space open to a level 1M service room without duct fire dampers at the base of the duct space. The proposed design is in lieu of a 1h vertical service space construction with fire dampers at the base of service space separating it form service room. Fire dampers will be provided in all duct penetrations of the duct space fire separation to storeys above level 1M. (refer to report November 26/2021)

    Applied Dec 7, 2021 · completed Feb 23, 2022 · Permit 21 245905 ALT

    Approved
  • Plumbing

    Revision 01 - Scope of work is to install new feature stairs on floors 2-3, 6-18, 33-46. Plumbing - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Nov 3, 2021 · issued Dec 9, 2021 · completed Jul 31, 2024 · Permit 18 236859 PLB (revision 01)

    Closed
  • Heating and ventilation

    REVISION 02 - Scope of work is to install new feature stairs on floors 2-3, 6-18, 33-46. REVISION - revised mechanical due to new floor openings and shaft wallsHVAC - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Nov 1, 2021 · issued Dec 9, 2021 · completed Dec 24, 2024 · Permit 18 236859 HVA (revision 02)

    Closed
  • New building

    REVISION 02 - Scope of work is to install new feature stairs on floors 2-3, 6-18, 33-46. REVISION - new floor openings and shaft walls around openings on various floorsProposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Nov 1, 2021 · issued Feb 7, 2022 · completed Jan 23, 2025 · Permit 18 236859 BLD (revision 02)

    Closed
  • Heating and ventilation

    REVISION - revised mechanical due to new floor openings and shaft wallsHVAC - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Dec 29, 2020 · issued Feb 1, 2021 · completed Dec 24, 2024 · Permit 18 236859 HVA (revision 01)

    Closed
  • New building

    REVISION - new floor openings and shaft walls around openings on various floorsProposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Dec 29, 2020 · issued Mar 3, 2021 · completed Jan 23, 2025 · Permit 18 236859 BLD (revision 01)

    Closed
  • Alternative solution

    The east elevation of the 46 storey sprinklered office building is curved on the vertical axis with the central storeys projecting further outwards than the lower and upper storeys. The 14th to 28th floors will have limiting distances slightly less than required for the proposed unprotected openings. Compensating construction will consist of closely spaced sprinklers extending the full width of the east elevation on the subject storeys. Operation of closely spaced sprinklers will create a water curtain reducing the transmission of radiant energy venting to the exterior and the corresponding r…

    Applied Sep 14, 2020 · completed Nov 3, 2020 · Permit 20 193376 ALT

    Approved
Show 30 more permits
  • Alternative solution

    Alternative Solution Application for PATH access escalator interconnected floor space related to 18 236859 NB - 160 Front St W

    Applied Jul 23, 2020 · completed Aug 28, 2020 · Permit 20 171479 ALT

    Approved
  • Partial permit · Partial permit - structural framing

    Part Permit Revision # 01 - To modify B1 and B2 levels to accommodate changes to the "PATH" tunnel connection.Part Permit - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Jul 6, 2020 · issued Aug 5, 2020 · completed Nov 9, 2020 · Permit 18 236859 STR (revision 01)

    Cancelled
  • Alternative solution

    Proposal for alternative solution for the Omission of Fire Hose Cabinets related to 18 236859 NB - 160 Front st W

    Applied Jun 12, 2020 · completed Apr 14, 2021 · Permit 20 155693 ALT

    Approved
  • Plumbing

    Plumbing - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Feb 12, 2020 · issued Sep 8, 2020 · completed Jul 31, 2024 · Permit 18 236859 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Feb 12, 2020 · issued Sep 8, 2020 · completed Dec 24, 2024 · Permit 18 236859 HVA

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Aug 6, 2019 · issued Apr 17, 2020 · completed Nov 9, 2020 · Permit 18 236859 STR

    Cancelled
  • Partial permit · Partial permit - foundation

    Part Permit - FoundationProposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Mar 5, 2019 · issued Sep 25, 2019 · completed Apr 17, 2020 · Permit 18 236859 FND

    Cancelled
  • Drains and site services · Inside and outside drains

    Drain - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Mar 4, 2019 · issued Oct 2, 2019 · completed Jul 31, 2024 · Permit 18 236859 STS

    Closed
  • Drains and site services

    Drain - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Mar 4, 2019 · issued Sep 9, 2019 · completed Jul 31, 2024 · Permit 18 236859 DRN

    Closed
  • Demolition

    Revision to Permit 18 220443 DEM 00 DM - (Demolish of the rear 55.11m of the existing 6-storey non-residential building). The scope of the revision is to demolish the remainder of the side walls, maintain the first 11m above grade of the front wall which is to be shored up. The portion of the front wall up to 11m will be dismantled and slavaged for reuse. Proposal to demolish existing 6-storey non-residential building. This demoliton will proceed in two stages. Stage one demoliton consists of the removal of a substantial portion of the building save and except for the front (south) portion of…

    Applied Jan 28, 2019 · issued Mar 4, 2019 · completed Jul 31, 2024 · Permit 18 220443 DEM (revision 01)

    Closed
  • Partial permit · Partial permit - shoring

    Part Permit - Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building.

    Applied Oct 9, 2018 · completed Sep 25, 2019 · Permit 18 236859 SHO

    Cancelled
  • New building

    Proposal to construct a 46 storey office tower with the front facade of the existing heritage building at 156 front street west to be incorporated into the design of the new building. Pending address 160 Front St W.

    Applied Oct 3, 2018 · issued Nov 10, 2020 · completed Jan 23, 2025 · Permit 18 236859 BLD

    Closed
  • Demolition

    Proposal to demolish existing 6-storey non-residential building. This demoliton will proceed in two stages. Stage one demoliton consists of the removal of a substantial portion of the building save and except for the front (south) portion of the building. This front portion will be demolished in a future phase.

    Applied Sep 5, 2018 · issued Jan 18, 2019 · completed Jul 31, 2024 · Permit 18 220443 DEM

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an existing office building - suite 400

    Applied Nov 13, 2017 · issued Dec 5, 2017 · completed Feb 22, 2018 · Permit 17 261510 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to an existing office building - suite 400

    Applied Nov 13, 2017 · issued Dec 5, 2017 · completed Feb 15, 2018 · Permit 17 261510 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an existing office building - suite 400

    Applied Nov 13, 2017 · issued Nov 20, 2017 · completed Feb 23, 2018 · Permit 17 261510 BLD

    Closed
  • Heating and ventilation

    REV 01: Removal of additional electric baseboard heaters requirement from M-01 drawingHVAC - interior alterations to existing office space - 5th Floor - Think Research

    Applied Jan 31, 2017 · issued Mar 1, 2017 · completed May 1, 2017 · Permit 15 103465 HVA (revision 01)

    Closed
  • Temporary structure · Certified tents

    Proposal to install one certified tent for Royal Bank of Canada "Employee Appreciation Day" event on surface parking lot. To be erected June 2, 2016 and dismantled June 2, 2016. 40' x 60' (Cert # 14-240264)

    Applied May 25, 2016 · issued May 27, 2016 · completed Mar 2, 2021 · Permit 16 161283 TPS

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - interior alterations to existing office space - 5th Floor - Think Research

    Applied Jan 22, 2015 · completed Apr 19, 2017 · Permit 15 103465 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    interior alterations to existing office space - 5th Floor - Think Research

    Applied Jan 12, 2015 · issued Jan 22, 2015 · completed May 5, 2017 · Permit 15 103465 BLD

    Closed
  • Heating and ventilation

    HVAC - interior alterations to existing office space - 5th Floor - Think Research

    Applied Jan 12, 2015 · issued Feb 5, 2015 · completed May 1, 2017 · Permit 15 103465 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alteration to existing office space.

    Applied Jul 30, 2014 · issued Sep 22, 2014 · completed Feb 24, 2026 · Permit 14 199527 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alteration to existing office space.

    Applied Jul 30, 2014 · issued Sep 22, 2014 · completed Feb 24, 2026 · Permit 14 199527 HVA

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office space on the 5th floor for "Adronovitch Macaulay Rollo". Proposal also includes HVAC.

    Applied Dec 11, 2013 · issued Dec 23, 2013 · completed Feb 24, 2026 · Permit 13 276784 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office space on the 5th floor for "Adronovitch Macaulay Rollo". Proposal also includes HVAC.

    Applied Dec 11, 2013 · issued Dec 23, 2013 · completed Feb 24, 2026 · Permit 13 276784 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office space on the 3rd floor - Snap Financial

    Applied May 14, 2013 · issued Jun 6, 2013 · completed Feb 24, 2026 · Permit 13 168047 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing 5th floor of existing office building "Andronovitch Macaulay Rollo" (61.7m2)

    Applied Apr 18, 2013 · issued May 13, 2013 · completed Feb 24, 2026 · Permit 13 152720 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing 5th floor of existing office building "Andronovitch Macaulay Rollo" (61.7m2)

    Applied Apr 18, 2013 · issued May 2, 2013 · completed Feb 24, 2026 · Permit 13 152720 BLD

    Closed
  • Addition or alteration · Interior alterations

    Minor interior aterations to existing office space on the 5th floor. Tenant - "Andronivitch Macaulay Rollo".

    Applied Jan 3, 2012 · issued Jan 6, 2012 · completed Feb 24, 2026 · Permit 12 100633 BLD

    Closed
  • Heating and ventilation

    HVAC - Minor interior aterations to existing office space on the 5th floor. Tenant - "Andronivitch Macaulay Rollo".

    Applied Jan 3, 2012 · issued Feb 1, 2012 · completed Feb 24, 2026 · Permit 12 100633 HVA

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.

    Decision: Approved (hearing Mar 19, 2025)

    Filed Nov 4, 2024 · File A0968/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 155 Wellington St W · Minor variance

    To alter the existing 42-storey mixed-use building by constructing a side (west) one-storey addition (patio enclosure for the existing eating establishment), abutting Wellington Street West.

    130 m away · filed Jul 20, 2026 · Postponed

  • 255 Front St W · Consent

    To obtain consent to sever the property into two non-residential stratified properties and to create new easements/rights-of-way.

    230 m away · filed Jul 12, 2024 · Application withdrawn

  • 95 Wellington St W · Minor variance

    To alter the Site-Specific By-law for the 22-storey mixed use building by constructing new vestibule entrances, expanding the retail component on the ground floor, and by constructing a new canopy along the Wellington Street West frontage.

    230 m away · filed Jun 16, 2020 · Approved

  • 40 University Ave · Minor variance

    To alter the existing mixed-use 14-storey building by reducing the number of parking spaces by one.

    90 m away · filed Jan 9, 2020 · Withdrawn

  • 43 Simcoe St · Minor variance

    To modify the redevelopment plan approved under Site-specific By-law 1027-2014 by increasing the height of the five-storey podium to accommodate an emergency generator.

    50 m away · filed Jul 20, 2019 · Approved

  • 40 University Ave · Minor variance

    To alter the existing 13-storey mixed-use building containing ground floor retail and 21 parking spaces by constructing an addition to the ground floor of the north, east, and south side. The ground floor commercial area will be expanded by enclosing the portion of the ground floor which is currently inset from the exterior main wall.

    90 m away · filed Jan 19, 2018 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.