Toronto address · Ward 10, Spadina-Fort York
43 Simcoe St
The City of Toronto has 2 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Heating and ventilation · Other
Proposal for new supplemental cooling units for IDF rooms on 21 and 22 floors. Connection of water chiller supply and return lines to the base building and installation of condensate drains for the fan coil units.
Applied Sep 9, 2025 · completed Sep 26, 2025 · Permit 25 222795 MSA
- Cancelled
Plumbing · Other
New supplemental cooling units for IDF rooms on 21 and 22 floors. Connection of water chiller supply and return lines to the base building and installation of condensate drains for the fan coil units.
Applied Sep 9, 2025 · completed Sep 26, 2025 · Permit 25 222827 PSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New NR building
To modify the redevelopment plan approved under Site-specific By-law 1027-2014 by increasing the height of the five-storey podium to accommodate an emergency generator.
Decision: Approved (hearing Jan 15, 2020)
Filed Jul 20, 2019 · File A0785/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
53-55 Simcoe Street and 145 Wellington Street West
65 storeys · 861 homes · Residential
80 m away · Rezoning · Under review · filed Oct 21, 2024
- Under review
80 storeys · 588 homes · Mixed use
300 m away · Site plan · Under review · filed Jun 7, 2021
- Under review
2,038 homes · Residential
350 m away · Condominium · Under review · filed Oct 29, 2021
- Under review
211 Adelaide Street West and 100 Simcoe Street
61 storeys · 526 homes · Mixed use
360 m away · Site plan · Under review · filed Mar 3, 2022
- Approved
- Under review
23 storeys · Residential
390 m away · Site plan · Under review · filed Feb 3, 2021
Neighbours’ Committee of Adjustment files within 250 m
155 Wellington St W · Minor variance
To alter the existing 42-storey mixed-use building by constructing a side (west) one-storey addition (patio enclosure for the existing eating establishment), abutting Wellington Street West.
90 m away · filed Jul 20, 2026 · Postponed
156 Front St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.
50 m away · filed Nov 4, 2024 · Approved
255 Front St W · Consent
To obtain consent to sever the property into two non-residential stratified properties and to create new easements/rights-of-way.
200 m away · filed Jul 12, 2024 · Application withdrawn
250 Front St W · Minor variance
To alter the development plan to allow for an increase in the permitted gross floor area of non-residential uses within the building.
250 m away · filed Apr 8, 2021 · Approved
40 University Ave · Minor variance
To alter the existing mixed-use 14-storey building by reducing the number of parking spaces by one.
90 m away · filed Jan 9, 2020 · Withdrawn
40 University Ave · Minor variance
To alter the existing 13-storey mixed-use building containing ground floor retail and 21 parking spaces by constructing an addition to the ground floor of the north, east, and south side. The ground floor commercial area will be expanded by enclosing the portion of the ground floor which is currently inset from the exterior main wall.
90 m away · filed Jan 19, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.