Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

1080 Bay St

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to construct a new waste storage room on parking levels P1 and P3.

    Applied Feb 24, 2020 · issued Feb 12, 2021 · Permit 20 118525 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to construct a new waste storage room on parking levels P1 and P3.

    Applied Feb 24, 2020 · issued Feb 12, 2021 · Permit 20 118525 BLD

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1075 Bay Street

    62 storeys · Residential

    50 m away · Rezoning · Approved · filed Aug 20, 2025

    Approved
  • 1075 Bay Street

    59 storeys · 540 homes · Mixed use

    50 m away · Condominium · Under review · filed Oct 22, 2021

    Under review
  • 25 St Mary Street

    59 storeys · Mixed use

    120 m away · Site plan · Under review · filed Jun 7, 2021

    Under review
  • 95 St Joseph Street

    40 storeys · 446 homes · Residential

    200 m away · Site plan · Approved · filed Apr 19, 2022

    Approved
  • 10 St Mary Street

    59 storeys · 650 homes · Mixed use

    230 m away · Site plan · Under review · filed Jul 23, 2021

    Under review
  • 646-664 Yonge Street and 2-4 Irwin Avenue

    75 storeys · 548 homes · Mixed use

    230 m away · Site plan · Under review · filed Dec 22, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 6 St Thomas St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    240 m away · filed May 26, 2026 · Hearing scheduled

  • 25 St Mary St · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 596-2023, for the existing 24-storey mixed-use building to modify the building setbacks and to reduce the indoor amenity provisions. This is currently under the review of Site Plan Control (File No. 21 166615 STE 13 SA). There will be a total of 1,024 residential dwelling units on this lot with retail and a daycare facility on the ground floor.

    130 m away · filed Jan 20, 2026 · Application withdrawn

  • 2 St Thomas St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    220 m away · filed Dec 31, 2025 · Hearing scheduled

  • 70 St Mary St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.

    120 m away · filed Dec 9, 2024 · Approved

  • 7 Charles St W · Consent

    To obtain consent for a technical severance to re-establish the lots which merged on title.

    250 m away · filed Nov 5, 2024 · Approved

  • 680 Yonge St · Minor variance

    To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.

    240 m away · filed Aug 23, 2024 · Approved

  • 95 St Joseph St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).

    180 m away · filed Jun 18, 2024 · Approved

  • 95 St Joseph St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-ways within a 40-storey mixed-use redevelopment.

    180 m away · filed Jun 18, 2024 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.