Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

119 Brandon Ave

The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed 2 storey addition

    Applied Aug 5, 2020 · issued Jun 2, 2021 · Permit 20 176701 PLB

    Revocation pending
  • Heating and ventilation

    HVAC - Proposed 2 storey addition

    Applied Aug 5, 2020 · issued Jun 2, 2021 · Permit 20 176701 HVA

    Revocation pending
  • Small residential project · Addition(s)

    Proposed 2 storey addition

    Applied Aug 5, 2020 · issued Jun 2, 2021 · Permit 20 176701 BLD

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter an existing two-storey townhouse by constructing a rear two-storey addition.

    Decision: Approved (hearing Jan 29, 2020)

    Filed Sep 23, 2019 · File A1083/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 302 Geary Ave · Minor variance

    To legalize and to maintain the recreation use (golf simulation services), which was constructed without an authorized building permit.

    210 m away · filed Feb 6, 2026 · Deferred

  • 1278 Dupont St · Minor variance

    170 m away · filed Jan 14, 2026 · Postponed

  • 41 Brandon Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front second storey balcony (above the existing porch).

    220 m away · filed Dec 17, 2025 · Approved

  • 871 St Clarens Ave · Minor variance

    To alter the existing three-storey (7-unit) detached apartment building by constructing one additional residential dwelling unit within the basement. There will be a total of 9 residential dwelling units on this lot (8 units within the main building and one unit within the two-storey detached ancillary building (two-car garage, and one laneway suite). There will be a total of six bicycle parking spaces (4 long-term spaces for the main dwelling, and 2 spaces for the laneway suite), located along the south wall of the ancillary building.

    130 m away · filed Oct 16, 2025 · Approved

  • 730 St Clarens Ave · Minor variance

    To permit three additional residential dwelling units (which were constructed without an authorized building permit) within the existing 17-storey apartment building (municipally known as 730 St. Clarens Avenue (East Tower)).

    230 m away · filed Oct 11, 2024 · Approved

  • 300 Geary Ave · Minor variance

    To alter the development for a four-and-one-half-storey office building currently under construction (as approved by Minor Variance Applications A0910/21TEY and A1000/22TEY) by reducing the required number of parking spaces to 12 parking spaces and providing all parking spaces as surface level parking spaces located in the rear of the property.

    230 m away · filed May 30, 2024 · Refused

  • 875 St Clarens Ave · Minor variance

    To alter the existing one-storey ancillary building (garage), in the rear yard, abutting the laneway, by constructing a complete second storey addition above, to contain one parking space and one laneway suite.

    140 m away · filed Oct 30, 2023 · Approved

  • 38 Brandon Ave · Minor variance

    To construct a new one-storey ancillary building (semi-detached garage) in the rear yard of the existing two-storey semi-detached dwelling. The existing semi-detached garage will be demolished.

    220 m away · filed Sep 12, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.