Toronto address · Ward 13, Toronto Centre
170 Mill St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
To erect and display one illuminated wall sign displaying static copy. Erected at the first storey of the north elevation of the building.****CANARY DENTAL****
Applied May 12, 2020 · issued May 28, 2020 · completed Aug 19, 2020 · Permit 20 144687 DST
- Closed
Designated structure · Sign building permit related
In conjunction with a multi-storey building on the premises, proposal to erect and display three wall signs, all illuminated and displaying static copy. One of the proposed wall signs is 0.86 metres vertically by 0.97 metres horizontally, one of the other proposed wall sign is 1.55 metres vertically by 1.74 metres horizontally and one of the proposed wall sign contains two sign faces, each measuring 0.51 metres vertically by 0.584 metres horizontally at a height of 3.61 metres above grade.**TD**
Applied Jul 27, 2017 · issued Aug 31, 2017 · completed Sep 15, 2017 · Permit 17 206677 DST
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
31 storeys · 859 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
45 storeys · 653 homes · Mixed use
170 m away · Site plan · Under review · filed Apr 9, 2021
- Approved
324 Cherry Street and 429 Lake Shore Boulevard East
53 storeys · 4,994 homes · Mixed use
170 m away · Rezoning · Approved · filed Jun 10, 2025
- Under review
43 storeys · 997 homes · Residential
290 m away · Site plan · Under review · filed Mar 23, 2023
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
360 m away · Site plan · Under review · filed Oct 21, 2025
- Under review
370 Cherry Street and 31R Parliament Street
Not stated in the file
380 m away · Subdivision · Under review · filed Nov 4, 2021
Neighbours’ Committee of Adjustment files within 250 m
425 Cherry St · Minor variance
To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).
130 m away · filed May 29, 2020 · Approved
457 Front St E · Minor variance
To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.
100 m away · filed Nov 8, 2019 · Approved
391 Cherry St · Minor variance
To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.
150 m away · filed Mar 21, 2019 · Approved
475 Front St E · Minor variance
To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.
130 m away · filed Mar 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.