Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

198 Earlscourt Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Oct 11, 2024 · issued Oct 11, 2024 · completed Oct 28, 2024 · Permit 24 188542 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Sep 11, 2024 · issued Oct 24, 2024 · completed Jan 17, 2025 · Permit 24 188542 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Jul 26, 2024 · issued Jul 29, 2024 · completed Jan 20, 2025 · Permit 24 188542 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Jul 26, 2024 · issued Jul 29, 2024 · completed Jan 20, 2025 · 1 home added · Permit 24 188542 BLD

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Jul 19, 2024 · completed Jul 24, 2024 · Permit 24 184189 PLB

    Cancelled
  • Small residential project · Multiple projects

    Proposed interior alterations, basement walkout and rear porch repair in order to convert existing single family dwelling into a 2-unit dwelling.

    Applied Jul 19, 2024 · completed Jul 25, 2024 · 1 home added · Permit 24 184189 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 188 Nairn Ave · Minor variance

    120 m away · filed May 12, 2026 · Postponed

  • 95 Day Ave · Minor variance

    To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.

    250 m away · filed Jan 13, 2025 · Approved

  • 86 Day Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.

    210 m away · filed Jun 12, 2024 · Approved

  • 195 Nairn Ave · Minor variance

    To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.

    80 m away · filed Feb 5, 2024 · Approved

  • 142 Earlscourt Ave · Minor variance

    To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.

    220 m away · filed Jun 1, 2023 · Approved

  • 137 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by enclosing the existing front porch and to construct new front stairs.

    50 m away · filed Apr 18, 2023 · Approved

  • 205 Earlscourt Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey ground floor side (north) addition for an integral garage and a complete second storey addition.

    40 m away · filed Dec 12, 2022 · Approved

  • 68 Day Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    230 m away · filed Dec 12, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.