Toronto address · Ward 9, Davenport
2 Gladstone Ave
The City of Toronto has 24 building permits since 2017 (17 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing bank on ground floor - "RBC"
Applied Feb 23, 2017 · issued Mar 1, 2017 · completed Jun 9, 2017 · Permit 17 120388 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing bank on ground floor - "RBC"
Applied Feb 23, 2017 · issued Mar 2, 2017 · completed May 29, 2017 · Permit 17 120388 HVA
- Closed
Heating and ventilation
REVISION - modify the ventilation systemHVAC - Proposal for interior alterations to Unit A for a restaurant "Lao Thai"
Applied Nov 18, 2016 · issued Nov 21, 2016 · completed Apr 30, 2026 · Permit 16 162972 HVA (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision # 01 - For power distribution and life saftey systems.Proposal for interior alterations to Unit A for a restaurant "Lao Thai"
Applied Sep 15, 2016 · issued Oct 6, 2016 · Permit 16 162972 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to Unit A for a restaurant "Lao Thai"
Applied May 27, 2016 · issued Jun 14, 2016 · Permit 16 162972 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to Unit A for a restaurant "Lao Thai"
Applied May 27, 2016 · issued Jun 14, 2016 · completed Sep 19, 2019 · Permit 16 162972 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to Unit A for a restaurant "Lao Thai"
Applied May 27, 2016 · issued Jun 14, 2016 · completed Apr 30, 2026 · Permit 16 162972 HVA
- Inspections under way
Heating and ventilation · HVAC: groups D & E
Proposal to install heat pump and condenser in Unit A, future tenant to come in for fit-out permit
Applied May 2, 2016 · issued May 3, 2016 · Permit 16 148821 MSA
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to ground floor commercial space for retail use. Unit C. Tenant - "GNC".
Applied Aug 15, 2014 · issued Aug 29, 2014 · Permit 14 207052 HVA
- Inspections under way
Heating and ventilation · HVAC: groups D & E
Proposal to install heat pump and new air duct un Unit B, future tenant to come in for fit-out permit
Applied Aug 7, 2014 · issued Aug 8, 2014 · Permit 14 202896 MSA
- Revision issued
Plumbing
REVISION TO EXISTING PLUMBING PERMIT DUE TO CHANGES IN BUILDING PERMITPlumbing - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Apr 11, 2013 · issued Aug 8, 2013 · Permit 10 115561 PLB (revision 02)
- Revision issued
Heating and ventilation
REVISION TO EXISTING HVAC PERMIT DUE TO CHANGES IN BUILDING PERMIT.HVAC - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Apr 11, 2013 · issued Aug 8, 2013 · Permit 10 115561 HVA (revision 02)
Show 12 more permits
- Revision issued
New building
Revision to relocate parking entrance/ramp; increase retail floor area, relocate 3 visitor parking spaces to level P1 and 7 resident parking spaces to 8 Gladstone Ave.
Applied Apr 11, 2013 · issued Sep 26, 2013 · Permit 10 115561 BLD (revision 02)
- Revision issued
Heating and ventilation
REVISION TO EXISTING HVAC PERMIT DUE TO CHANGES IN BUILDING PERMIT.HVAC - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jan 24, 2012 · issued Aug 8, 2012 · Permit 10 115561 HVA (revision 01)
- Revision issued
New building
REVISION TO EXISTING BUILDING PERMIT - SEE CHANGES ON DRAWINGS - FURTHER EXPLANATIONS TO FOLLOW.Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 55 residential units.BIN 2261
Applied Jan 24, 2012 · issued Apr 11, 2013 · 1 home added · Permit 10 115561 BLD (revision 01)
- Revision issued
Plumbing
REVISION TO EXISTING PLUMBING PERMIT DUE TO CHANGES IN BUILDING PERMITPlumbing - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jan 24, 2012 · issued Aug 8, 2012 · Permit 10 115561 PLB (revision 01)
- Closed
Plumbing
Plumbing - Proposal for interior alterations to ground floor unit for new tenant - RBC.
Applied Sep 12, 2011 · issued Sep 28, 2011 · completed Jul 21, 2026 · Permit 11 272884 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to ground floor unit for new tenant - RBC.
Applied Sep 12, 2011 · issued Sep 28, 2011 · completed Jul 21, 2026 · Permit 11 272884 HVA
- Inspections under way
Fire and security upgrade · Sprinklers
Sprinkler permit for new building - Please note fees are paid under 10 115561 BLD
Applied May 30, 2011 · issued Sep 28, 2011 · Permit 11 205667 FSU
- Inspections under way
Drains and site services · Inside and outside drains
Drain - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jul 29, 2010 · issued Aug 19, 2011 · Permit 10 115561 STS
- Permit issued
Drains and site services
Drain - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jun 23, 2010 · issued Aug 19, 2011 · Permit 10 115561 DRN
- Inspections under way
Heating and ventilation
HVAC - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jun 8, 2010 · issued Aug 29, 2011 · Permit 10 115561 HVA
- Inspections under way
Plumbing
Plumbing - Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Jun 7, 2010 · issued Aug 19, 2011 · Permit 10 115561 PLB
- Inspections under way
New building
Construction of a 8 storey mixed use building. The ground floor will be retail/commercial and floors 2 through to 8 will be residential for 53 residential units.
Applied Feb 8, 2010 · issued Sep 28, 2011 · 54 homes added · Permit 10 115561 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
6 storeys · 28 homes · Residential
100 m away · Site plan · Under review · filed Dec 10, 2021
- Under review
3 storeys · 2 homes · Residential
130 m away · Condominium · Under review · filed Jan 19, 2024
- Under appeal
27 storeys · 367 homes · Mixed use
190 m away · Rezoning · Under appeal · filed Nov 13, 2024
- Under review
29 storeys · 768 homes · Mixed use
190 m away · Site plan · Under review · filed Aug 31, 2022
- Approved
27 storeys · 362 homes · Mixed use
200 m away · Site plan · Approved · filed Apr 21, 2023
- Under review
12 storeys · 169 homes · Mixed use
250 m away · Condominium · Under review · filed Dec 16, 2021
Neighbours’ Committee of Adjustment files within 250 m
61 Northcote Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a cantilevered side (north) bay window, and a rear balcony. Also, to alter the existing rear one-storey semi-detached ancillary building (one-car garage abutting the laneway) by constructing a complete second storey addition (containing storage space).
230 m away · filed Jul 29, 2026 · Hearing scheduled
18 Beaconsfield Ave · Minor variance
To legalize and to maintain the existing rear two-storey ancillary building (containing a one-car garage, and one laneway suite), abutting the laneway. This building was constructed without an authorized building permit. There is a total of two residential dwelling units on this lot (one unit within the main building, and one unit within the ancillary building).
200 m away · filed Jul 8, 2026 · Hearing scheduled
11 Northcote Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex), with side (south) cantilevered second and third storeys, a rear covered ground floor deck with stairs, a front second storey balcony, front third storey balcony, a rear second storey balcony, front and rear basement walkouts with patios and a side (north) basement level patio. Also, to construct a new two-storey ancillary building (containing one Laneway suite) with a rear (east) cantilevered second storey, in the rear yard abutting the laneway There will be a total of five residential dwelling units on this lot (four units within…
140 m away · filed Dec 29, 2025 · Approved
20 Beaconsfield Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front one-car carport structure and to permit a new front yard parking space, abutting Beaconsfield Avenue (within the new front one-car carport structure). Also, to reduce the rear yard soft landscaping approved in Minor Variance Decision A0130/24TEY by constructing a rear ground floor deck, a rear walkway, and a hot tub in the rear yard. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building containing one laneway…
200 m away · filed Aug 7, 2025 · Approved
9 Beaconsfield Ave · Minor variance
To permit a front yard parking pad on the existing interlock area abutting the east side of Beaconsfield Avenue, and to alter the vehicle access from Beaconsfield Avenue to the side lane (Lisgar Place). The existing three-storey duplex will remain unchanged. There are a total of two dwelling units on the lot.
240 m away · filed Jul 11, 2025 · Approved
78 Gladstone Ave · Minor variance
To legalize and to maintain the existing three-storey semi-detached dwelling (fourplex) with front steps, rear second and third floor balconies, and a rear basement walkout (currently under construction, as approved by Minor Variance Application A1102/19TEY) by reconstructing the north wall of the dwelling that was demolished without an authorized building permit. Also, to alter the existing two-storey ancillary building containing one laneway suite (currently under construction, as approved by Minor Variance Application A1102/19TEY), abutting the laneway and Alma Avenue by increasing the hei…
240 m away · filed Mar 20, 2025 · Approved
11 Peel Ave · Consent
To obtain consent for a stratified severance of an existing non-residential (retail) unit (34 Minowan Miikan Lane) located on the Ground Floor, Parking Level 1, and Parking Level 2 (within a 6 to 12-storey mixed-use building) into three separate ownership retail units. Also, to maintain the existing easements/rights-of-way.
150 m away · filed Jan 10, 2025 · Approved
19 Alma Ave · Minor variance
To construct a new two-storey ancillary building (to contain one laneway suite with a carport and a roof access staircase, abutting the laneway), in the rear yard of the existing two-storey townhouse dwelling. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
240 m away · filed Dec 5, 2024 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.