Toronto address · Ward 19, Beaches-East York
20 Trent Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Fire and security upgrade · Fire alarm
permit to update existing fire alarm system with voice communication and install new pannel in existing apartment building.
Applied Jul 22, 2011 · issued Aug 19, 2011 · Permit 11 244135 FSU
- Inspections under way
Fire and security upgrade · Electromagnetic locks
permit for 4 maglocks in existing apartment building
Applied Apr 12, 2010 · issued May 5, 2010 · Permit 10 149717 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
33 storeys · 769 homes · Mixed use
120 m away · Condominium · Under review · filed Oct 28, 2021
- Approved
38 storeys · 636 homes · Mixed use
120 m away · Site plan · Approved · filed Aug 10, 2021
- Under review
- Under appeal
55 storeys · 1,139 homes · Mixed use
180 m away · Subdivision · Under appeal · filed Nov 7, 2021
- Under review
8 storeys · 64 homes · Not stated in the file
180 m away · Site plan · Under review · filed Mar 10, 2026
- Under appeal
48 storeys · 1,050 homes · Residential
250 m away · Rezoning · Under appeal · filed Dec 21, 2022
Neighbours’ Committee of Adjustment files within 250 m
26 Luttrell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition.
190 m away · filed Jun 30, 2026 · Postponed
10 Dawes Rd · Minor variance
To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.
130 m away · filed May 3, 2024 · Approved
9 Dawes Rd · Minor variance
To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.
110 m away · filed Nov 7, 2023 · Approved
72 Whistle Post St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front basement entrance and converting the basement into a secondary suite.
200 m away · filed Apr 11, 2021 · Approved
2822 Danforth Ave · Minor variance
To alter the existing two-storey commercial building by constructing a partial second storey addition and a third storey addition.
110 m away · filed Mar 23, 2021 · Approved
157 1/2 Coleman Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing an enclosed front porch with stairs, a rear two-storey addition with a ground floor deck and second storey balcony, and a rear basement walkout.
250 m away · filed Feb 27, 2019 · Approved
2 Kelvin Ave · Minor variance
To construct a public storage facility comprised a four-storey building component on the west side of the property and a three-storey building component on the east side of the property.
140 m away · filed Nov 9, 2017 · Approved
2766 Danforth Ave · Consent
To obtain consent to the technical severance of the property for the purpose of re-establishing the two lots which merged on title.
120 m away · filed Aug 7, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.