Toronto address · Ward 9, Davenport
243 Perth Ave
Perth Avenue Seventh Day
The City of Toronto has 8 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Revision to plumbing as per attached detailed list.
Applied Nov 15, 2017 · issued Nov 28, 2017 · completed Apr 6, 2018 · Permit 13 215472 PLB (revision 01)
- Closed
Heating and ventilation
Revision to plumbing as per attached detailed list.
Applied Nov 15, 2017 · issued Nov 28, 2017 · completed Mar 13, 2018 · Permit 13 215472 HVA (revision 01)
- Cancelled
Designated structure · Sign building permit related
To erect and display one illuminated wall sign.**ARCH LOFTS**
Applied Jun 20, 2017 · completed Aug 30, 2017 · Permit 17 183625 DST
- Closed
Designated structure · Sign building permit related
In conjunction with the conversion of an existing building into a multi-unit residential building, proposal to erect and display a non-illuminated development ground sign displaying static copy, on the southerly property frontage. The proposed sign is to be 2.44 metres in width by 4.88 metres in length, at an overaljl height of 5.03 metres. NOTE: The proposed sign is not within the scope of the Sign By-law as per 694-2A(2). **UNION LOFTS**
Applied Feb 6, 2015 · issued Jul 27, 2017 · completed Mar 8, 2018 · Permit 15 113119 DST
- Cancelled
Partial permit · Partial permit - structural framing
Part Permit - Proposal to convert existing place of worship into a residential building containing a total of 40 dwelling units; construct a new 4 storey addition w/parking garage below & 19 parking spaces.
Applied Nov 12, 2013 · completed Jul 28, 2017 · Permit 13 215472 STR
- Closed
Plumbing
Plumbing - Proposal to convert existing (heritage structure) place of worship into a residential apartment building containing 40 dwelling units complete with 20 parking spaces , 16 of which would be located in a below grade parking structure located under a new 4 storey building.
Applied Aug 7, 2013 · issued Mar 5, 2014 · completed Apr 6, 2018 · Permit 13 215472 PLB
- Closed
Heating and ventilation
HVAC - Proposal to convert existing (heritage structure) place of worship into a residential apartment building containing 40 dwelling units complete with 20 parking spaces , 16 of which would be located in a below grade parking structure located under a new 4 storey building.
Applied Aug 7, 2013 · issued Mar 18, 2014 · completed Mar 13, 2018 · Permit 13 215472 HVA
- Closed
Addition or alteration · Multiple projects
Proposal to convert existing place of worship into a residential building containing a total of 40 dwelling units; construct a new 4 storey addition w/parking garage below & 19 parking spaces.
Applied Aug 2, 2013 · issued Oct 13, 2017 · completed Apr 6, 2018 · 43 homes added · Permit 13 215472 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
29 storeys · 288 homes · Mixed use
350 m away · Site plan · Under review · filed Jul 25, 2024
- Under review
42 storeys · 56 homes · Not stated in the file
390 m away · Site plan · Under review · filed Jun 27, 2025
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
390 m away · Rezoning · Under review · filed May 14, 2026
Neighbours’ Committee of Adjustment files within 250 m
209 Symington Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.
200 m away · filed Jul 28, 2026 · Approved
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
60 m away · filed Jul 7, 2026 · Approved
182 Symington Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.
80 m away · filed Nov 7, 2024 · Approved
105 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.
250 m away · filed Jan 17, 2024 · Refused
89 Symington Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
210 m away · filed Oct 30, 2023 · Approved
5 Ruskin Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.
170 m away · filed Aug 8, 2023 · Approved
105 Campbell Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.
250 m away · filed Jun 1, 2023 · Approved
166 Campbell Ave · Minor variance
To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.
160 m away · filed Mar 2, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.