Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

290 Perth Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to construct a rear rooftop balcony platform at the third floor level of existing SFD.

    Applied Jun 9, 2025 · issued Jun 23, 2025 · completed Nov 12, 2025 · Permit 25 173830 BLD

    Closed
  • Drains and site services

    Drain - Proposal to construct interior alteration of existing semi detached SFD that includes a 4 sq.m balcony facing backyard at the third floor level.

    Applied Sep 29, 2023 · issued Sep 29, 2023 · completed Nov 27, 2023 · Permit 23 187261 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alteration of existing semi detached SFD that includes a 4 sq.m balcony facing backyard at the third floor level.

    Applied Aug 11, 2023 · issued Sep 6, 2023 · completed Jul 17, 2024 · Permit 23 187261 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alteration of existing semi detached SFD that includes a 4 sq.m balcony facing backyard at the third floor level.

    Applied Aug 11, 2023 · issued Aug 23, 2023 · completed Jul 17, 2024 · Permit 23 187261 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct interior alteration of existing semi detached SFD that includes a 4 sq.m balcony facing backyard at the third floor level.

    Applied Aug 11, 2023 · issued Aug 23, 2023 · completed Jul 17, 2024 · Permit 23 187261 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    150 m away · filed Jul 28, 2026 · Approved

  • 261 Perth Ave · Minor variance

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    90 m away · filed Jul 7, 2026 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    130 m away · filed Nov 7, 2024 · Approved

  • 267 Symington Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    240 m away · filed May 14, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    230 m away · filed Apr 6, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    40 m away · filed Aug 8, 2023 · Approved

  • 166 Campbell Ave · Minor variance

    To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.

    240 m away · filed Mar 2, 2023 · Refused

  • 371 Wallace Ave · Minor variance

    To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.

    240 m away · filed Apr 19, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.