Toronto address · Ward 13, Toronto Centre
35 Charles St W
The City of Toronto has 16 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Replacing existing generator in generator room for existing building to comply with TSSA. Ventilation pit is being modified for compliance.
Applied May 14, 2024 · issued Jun 13, 2024 · completed Jan 19, 2026 · Permit 24 148342 PLB
- Closed
Addition or alteration · Interior alterations
Replacing existing generator in generator room for existing building to comply with TSSA. Ventilation pit is being modified for compliance.
Applied May 14, 2024 · issued Jun 3, 2024 · completed Feb 2, 2026 · Permit 24 148342 BLD
- Closed
Heating and ventilation
HVAC - Replacing existing generator in generator room for existing building to comply with TSSA. Ventilation pit is being modified for compliance.
Applied May 14, 2024 · issued Jun 13, 2024 · completed Jan 26, 2026 · Permit 24 148342 HVA
- Permit issued
Addition or alteration · Interior alterations
Interior demolition to ground floor retail units 25-27 for leasing (Back to Base)
Applied Sep 19, 2022 · issued Sep 28, 2022 · Permit 22 205862 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing student residence - suite 305
Applied Feb 5, 2018 · issued Feb 16, 2018 · completed Sep 7, 2018 · Permit 18 113694 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing student residence - suite 305
Applied Feb 5, 2018 · issued Mar 6, 2018 · completed Aug 23, 2018 · Permit 18 113694 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to existing student residence - suite 305
Applied Feb 5, 2018 · issued Mar 6, 2018 · completed Feb 8, 2019 · Permit 18 113694 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the parking garage for new bike racking system enclosed with fencing and access doors.
Applied Oct 28, 2016 · issued Jan 30, 2017 · completed Mar 16, 2017 · Permit 16 243893 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the 2nd floor, "Residence Life Centre"
Applied Feb 22, 2016 · issued May 20, 2016 · completed Jan 21, 2020 · Permit 16 119082 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the 2nd floor, "Residence Life Centre"
Applied Feb 22, 2016 · issued May 20, 2016 · completed Aug 16, 2019 · Permit 16 119082 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the 2nd floor, "Residence Life Centre"
Applied Feb 22, 2016 · issued May 20, 2016 · completed May 13, 2019 · Permit 16 119082 BLD
- Inspections under way
Fire and security upgrade · Fire alarm
Proposal to upgrade the fire alarm system in an existing student residence for U of T building.
Applied Apr 20, 2015 · issued Jun 5, 2015 · Permit 15 143994 FSU
Show 4 more permits
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Slab surface replacement and localized concrete repairs and waterproofing. This is Phase 1/1A for the University of Toronto
Applied Mar 26, 2010 · issued Apr 19, 2010 · Permit 10 140754 BLD
- Inspections under way
Heating and ventilation
HVAC - Make interior alterations to ground floor office; refurbish existing bicycle storage on lower level.
Applied Jun 9, 2006 · issued Jun 19, 2006 · Permit 06 145022 HVA
- Closed
Heating and ventilation
HVAC--Make interior alterations to portion of the 1st floor to expand existing dental office.In conjunction with BP 04-101098
Applied Jan 12, 2004 · issued Apr 19, 2004 · completed Apr 20, 2020 · Permit 04 101732 HVA
- Inspections under way
Heating and ventilation · Unknown
Supply and install kitchen exhaust system to take-out restaurant jnb
Applied Mar 3, 1999 · issued Apr 13, 1999 · Permit 99 013904 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
59 storeys · 650 homes · Mixed use
90 m away · Site plan · Under review · filed Jul 23, 2021
- Under review
- Approved
- Under review
59 storeys · 540 homes · Mixed use
140 m away · Condominium · Under review · filed Oct 22, 2021
- Under review
5-17 Hayden Street, 699-707 Yonge Street and 8 Charles Street East
64 storeys · 514 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 20, 2022
- Under review
76 storeys · 678 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 15, 2022
Neighbours’ Committee of Adjustment files within 250 m
25 St Mary St · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 596-2023, for the existing 24-storey mixed-use building to modify the building setbacks and to reduce the indoor amenity provisions. This is currently under the review of Site Plan Control (File No. 21 166615 STE 13 SA). There will be a total of 1,024 residential dwelling units on this lot with retail and a daycare facility on the ground floor.
100 m away · filed Jan 20, 2026 · Application withdrawn
70 St Mary St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.
220 m away · filed Dec 9, 2024 · Approved
7 Charles St W · Consent
To obtain consent for a technical severance to re-establish the lots which merged on title.
70 m away · filed Nov 5, 2024 · Approved
680 Yonge St · Minor variance
To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.
160 m away · filed Aug 23, 2024 · Approved
30 Charles St E · Minor variance
To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.
240 m away · filed Jun 2, 2024 · Refused
7 Sultan St · Minor variance
To alter the existing 9-storey commercial building by constructing a front ground floor one-storey addition (vestibule with an integrated rain water management system) fronting Sultan Street between two office condominium units (5 and 7 Sultan Street).
230 m away · filed May 14, 2024 · Approved
1099 Bay St · Minor variance
To alter the existing 27-storey mixed-use building by constructing a storage area on Level P4 (to replace an existing non-conforming storage area on Level P5), and to permit a reduction in the number of parking spaces for residents from 127 spaces to 112 spaces. The 15 existing parking spaces for visitors will be maintained and unaltered. Also, to permit a reduction to the required length of 25 existing parking spaces.
90 m away · filed Jan 24, 2024 · Withdrawn
10 St Mary St · Minor variance
To alter the development to increase the height of the approved 51-storey mixed-use building (located on the west side of the site, abutting St. Nicholas Street) as shown on Revised Diagram 3 and to alter the building setback, encroachment and projection of elements of the building including terraces and balconies, as shown on Revised Diagram 3. Also, to increase the residential gross floor area, number of dwelling units (no maximum number of dwelling units), number of vehicle access locations, alter loading space provisions and to reduce the number of automobile parking spaces and size of ob…
110 m away · filed Sep 23, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.