Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

41 Lake Shore Dr

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Replace heating equipment with new high-efficiency equipment in an existing apartment building.

    Applied Jun 12, 2025 · issued Jul 9, 2025 · Permit 25 176036 MSA

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    - Removal of overburden (asphalt, landscaped areas)- Localized concrete repairs (top surface, through slab) on asphalt and landscaped areas- Waterproofing repairs on asphalt and landscaped areas

    Applied Dec 19, 2016 · issued Jan 16, 2017 · Permit 16 268641 BLD

    Permit issued
  • Plumbing · Other

    Replace existing domestic water risers and unit branches (floors 1-8).July 17/06-new drawings submitted as per examiners notice

    Applied Jun 15, 2006 · issued Jul 18, 2006 · Permit 06 146967 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 66 Third Street

    4 storeys · Not stated in the file

    390 m away · Site plan · Under review · filed Mar 13, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 53 Lake Shore Dr · Minor variance

    To construct a second storey addition above the existing dwelling, to reconfigure the existing basment walkout and a new covered deck along the south side.

    120 m away · filed Oct 4, 2024 · Approved

  • 45 Fourth St · Minor variance

    To construct a two-storey front addition and a new front porch.

    130 m away · filed Aug 21, 2023 · Approved

  • 38 Fourth St · Minor variance

    To construct a two-storey south side addition and to maintain the existing driveway.

    120 m away · filed Dec 15, 2022 · Approved

  • 33 Third St · Minor variance

    To construct a two-storey addition above the existing dwelling and a two-storey rear addition.

    250 m away · filed Feb 8, 2022 · Approved

  • 43 Fifth St · Minor variance

    To construct a one-storey rear addition, a second storey addition above the existing dwelling, a new covered front porch and a rear yard deck.

    120 m away · filed Oct 8, 2021 · Approved

  • 83 Fifth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Jun 6, 2021 · Approved

  • 66 Fifth St · Minor variance

    To legalize and to maintain the existing secondary suite and a second storey rear platform.

    200 m away · filed Oct 14, 2020 · Approved

  • 66 Fifth St · Minor variance

    To permit a parking deficiency.

    200 m away · filed May 30, 2019 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.