Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

433 Cherry St

The City of Toronto has 9 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    REV 02: proposed changes are the exhaut duct connection, change in dryer exhaust connection and addion of additional base board heaters.Rev 01 - Proposing reception area, smoothie bar, cold plunge room, office, one universal washroom (with shower) and two unisex washrooms along with shower. All the exterior doors,windows and footprint of the building will remain as is.HVAC - Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Aug 10, 2026 · issued Sep 16, 2026 · Permit 25 206809 HVA (revision 02)

    Revision issued
  • Heating and ventilation

    Rev 01 - Proposing reception area, smoothie bar, cold plunge room, office, one universal washroom (with shower) and two unisex washrooms along with shower. All the exterior doors,windows and footprint of the building will remain as is.HVAC - Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Nov 21, 2025 · completed Jan 5, 2026 · Permit 25 206809 HVA (revision 01)

    Cancelled
  • Plumbing

    Rev 01 - Proposing reception area, smoothie bar, cold plunge room, office, one universal washroom (with shower) and two unisex washrooms along with shower. All the exterior doors,windows and footprint of the building will remain as is.Plumbing - Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Nov 21, 2025 · issued Dec 18, 2025 · Permit 25 206809 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Rev 01 - Proposing reception area, smoothie bar, cold plunge room, office, one universal washroom (with shower) and two unisex washrooms along with shower. All the exterior doors,windows and footprint of the building will remain as is.Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Nov 21, 2025 · completed Jan 5, 2026 · Permit 25 206809 BLD (revision 01)

    Cancelled
  • Designated structure · Sign building permit related

    1 projecting sign**oxygen yoga & fitness**

    Applied Oct 16, 2025 · issued Nov 6, 2025 · Permit 25 240551 DST

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Aug 7, 2025 · issued Sep 18, 2025 · Permit 25 206809 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Aug 7, 2025 · issued Sep 18, 2025 · Permit 25 206809 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a Yoga studio in vacant unit of the new building. All exterior doors, windows, and footprint of the building will remain as is.

    Applied Aug 7, 2025 · issued Sep 18, 2025 · Permit 25 206809 HVA

    Inspections under way
  • Designated structure · Sign building permit related

    1 Ground Sign

    Applied Sep 26, 2024 · issued Oct 15, 2024 · completed Mar 11, 2026 · Permit 24 218289 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 60 Trinity St · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    250 m away · filed Oct 18, 2022 · Approved

  • 425 Cherry St · Minor variance

    To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

    10 m away · filed May 29, 2020 · Approved

  • 457 Front St E · Minor variance

    To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.

    100 m away · filed Nov 8, 2019 · Approved

  • 391 Cherry St · Minor variance

    To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.

    180 m away · filed Mar 21, 2019 · Approved

  • 475 Front St E · Minor variance

    To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.

    200 m away · filed Mar 20, 2018 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.