Toronto address · Ward 3, Etobicoke-Lakeshore
46 Thirty Sixth St
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01. Rear bay window has been added to the plansHVAC - Proposal to construct a two storey rear addition with minor interior alterations and a new rear deck for an existing detached single family dwelling.
Applied May 2, 2022 · issued May 20, 2022 · completed Nov 4, 2022 · Permit 22 112148 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Revision 01. Rear bay window has been added to the plansProposal to construct a two storey rear addition with minor interior alterations a new rear deck + rear covered patio + Walk-out for an existing detached single family dwelling.
Applied May 2, 2022 · issued Jun 17, 2022 · completed Nov 25, 2024 · Permit 22 112148 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a two storey rear addition with minor interior alterations and a new rear deck for an existing detached single family dwelling.
Applied Mar 14, 2022 · issued Mar 24, 2022 · completed Nov 4, 2022 · Permit 22 112148 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a two storey rear addition with minor interior alterations and a new rear deck for an existing detached single family dwelling.
Applied Feb 8, 2022 · issued Mar 16, 2022 · completed Nov 4, 2022 · Permit 22 112148 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a two storey rear addition with minor interior alterations a new rear deck + rear covered patio + Walk-out for an existing detached single family dwelling.
Applied Feb 8, 2022 · issued Mar 16, 2022 · completed Nov 25, 2024 · Permit 22 112148 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey rear addition, a new rear deck and new rear basement walkout.
Decision: Approved (hearing Nov 30, 2021)
Filed Oct 14, 2021 · File A0520/21EYK
What’s planned nearby
Development sites within 500 m
- Under appeal
220-240 Lake Promenade and 21-31 Park Boulevard
30 storeys · Residential
470 m away · Subdivision · Under appeal · filed Apr 17, 2023
Neighbours’ Committee of Adjustment files within 250 m
16 James St · Minor variance
To permit a driveway in the rear yard for the purpose of access to the existing ancillary building (garden suite).
90 m away · filed Nov 4, 2025 · Refused
42 Thirty Eighth St · Minor variance
To construct a new duplex dwelling with an attached garage.
200 m away · filed Jun 5, 2025 · Approved
11 Thirty Sixth St · Minor variance
To construct a new detached dwelling with an attached garage and a deck in the rear yard.
250 m away · filed Dec 31, 2024 · Refused
12 Thirty Eighth St · Minor variance
To construct a new duplex with an attached garage.
240 m away · filed Aug 28, 2024 · Approved
12 Thirty Eighth St · Minor variance
To construct a new duplex with an attached garage.
240 m away · filed Aug 28, 2024 · Approved
12 Thirty Eighth St · Consent
To obtain consent to sever the property into two undersized residential lots and to create easements/ right-of-ways.
240 m away · filed Aug 28, 2024 · Approved
77 Thirty Seventh St · Consent
To obtain consent to sever the lot into two undersized residential lots.
210 m away · filed Jul 29, 2024 · Refused
77 Thirty Seventh St · Minor variance
To construct a new duplex with an attached garage and a new front porch.
210 m away · filed Jul 27, 2024 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.