Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

50 Walmer Rd

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Install one new Backflow Prevention Devices (Water only)

    Applied Oct 7, 2016 · issued Oct 20, 2016 · completed Sep 1, 2026 · Permit 16 234617 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 386 Brunswick Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey front addition (enclosing the front porch) with stairs, a rear basement addition with a walkout, rear one and two-storey additions with second and third storey balconies, and a rear third storey dormer addition. Also, to reconstruct the front (northeast) turret.

    160 m away · filed Nov 21, 2025 · Approved

  • 125 Howland Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front barrier-free access ramp with guardrails (connecting to the existing front covered porch). The rear deck will be constructed within full compliance of the Zoning By-law(s).

    240 m away · filed Aug 20, 2025 · Approved

  • 386 Brunswick Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear basement walkout, a rear two-storey addition with rear decks on the first and second levels, and a third storey addition (north side dormer extension) with a rear deck. The existing rear one-storey ancillary building (detached garage) will be maintained and unaltered.

    160 m away · filed Mar 24, 2025 · Approved

  • 109 Spadina Rd · Minor variance

    To convert the existing 3-storey semi-detached dwelling into a hotel by constructing a rear 3-storey addition, along with interior alterations. The existing rear ground floor deck to be demolished.

    240 m away · filed Jan 7, 2025 · Application withdrawn

  • 83 Spadina Rd · Minor variance

    To construct a new two-storey semi-detached ancillary building (to contain one garden suite) in the rear yard of the existing two-and-one-half-storey semi-detached dwelling. There will be a total of two residential dwelling units on this lot (one unit in the main dwelling and one unit in the ancillary building).

    200 m away · filed Dec 23, 2024 · Approved

  • 81 Spadina Rd · Minor variance

    To construct a new two-storey semi-detached ancillary building (to contain one garden suite) in the rear yard of the existing two-and-one-half-storey semi-detached dwelling. There will be a total of two residential dwelling units on this lot (one unit in the main dwelling and one unit in the ancillary building).

    200 m away · filed Dec 23, 2024 · Approved

  • 54 Madison Ave · Consent

    To obtain consent to sever a portion of the lot (54 Madison Avenue) for the purpose of a lot addition to the receiving lands (108 A Lowther Avenue).

    250 m away · filed Sep 29, 2023 · Approved

  • 11 Kendal Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front and rear second storey addition, a rear third storey addition, a rear second storey deck, a rear third storey balcony, a front basement walkout to accommodate one secondary suite within the basement, and a rear basement walkout.

    110 m away · filed May 5, 2023 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.