Toronto address · Ward 10, Spadina-Fort York

55 Front St W

Union Station

The City of Toronto has 15 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REV01: REVISION TO PLUMBING PERMIT #24 171478 PLB 00 PS PER CoT DISCUSSION & REQUESTPlumbing - PROPOSAL FOR INTERIOR ALTERATIONS, NEW EQUIPMENT, LIGHTING, FINISHES, MILLWORK- NO CHANGE IN USE OR INCREASE IN OCCUPANT LOAD

    Applied Jan 22, 2025 · issued Feb 20, 2025 · completed Feb 24, 2025 · Permit 24 171478 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations, new equipment, lighting, finishes, millwork- no change in use or increase in occupant load

    Applied Jun 27, 2024 · issued Jul 30, 2024 · completed Feb 21, 2025 · Permit 24 171478 BLD

    Closed
  • Plumbing

    Plumbing - PROPOSAL FOR INTERIOR ALTERATIONS, NEW EQUIPMENT, LIGHTING, FINISHES, MILLWORK- NO CHANGE IN USE OR INCREASE IN OCCUPANT LOAD

    Applied Jun 27, 2024 · issued Jul 30, 2024 · completed Feb 24, 2025 · Permit 24 171478 PLB

    Closed
  • Heating and ventilation

    Hvac - proposal for interior alterations, new equipment, lighting, finishes, millwork- no change in use or increase in occupant load

    Applied Jun 27, 2024 · issued Jul 30, 2024 · completed Feb 27, 2025 · Permit 24 171478 HVA

    Closed
  • Heating and ventilation

    Revision to include ventilation in 2 existing electrical rooms and 1 existing staion washroom.

    Applied Aug 31, 2016 · issued Oct 24, 2016 · completed May 31, 2017 · Permit 09 174823 HVA (revision 01)

    Closed
  • Fire and security upgrade · Sprinklers

    Sprinkler permit in conjunction with 09 174823 BLD.

    Applied Sep 21, 2012 · issued Sep 26, 2012 · Permit 12 251183 FSU

    Inspections under way
  • Addition or alteration · Multiple projects

    REVISION 7: This is a revision to building and shoring for phase 4D South and phase 4B South.REVISION 6: This is a revision to the shoring project for phase 8 south shoring plans prepared by Stephenson Engineering.

    Applied Jul 3, 2012 · issued Sep 25, 2012 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 07)

    Closed
  • Addition or alteration · Multiple projects

    REVISION 6: This is a revision to the shoring project for phase 8 south shoring plans prepared by Stephenson Engineering.

    Applied Dec 19, 2011 · issued Jan 26, 2012 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 06)

    Closed
  • Addition or alteration · Multiple projects

    REVISION 5: This is a revision to the shoring project for Phase 4A and 4C South along with 4D North shoring plans prepared by Stephenson Engineering. NOTE: additional scope added to revision on Nov 25/11 - Phase 8 South Shoring.

    Applied Nov 10, 2011 · issued Dec 20, 2011 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 05)

    Closed
  • Addition or alteration · Multiple projects

    REVISION 4 - as per drawings and attached letter. Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.

    Applied Oct 11, 2011 · issued Nov 17, 2011 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 04)

    Closed
  • Addition or alteration · Multiple projects

    REVISION 3: This is a revision to the shoring on the North side of the TTC platform.Revision 2: Proposed alterations to shoring project on north side of new TTC platform.Revision: Proposal for excavation and shoring on north side of new TTC platform. (Phase 6 and Phase 8)Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.

    Applied Aug 11, 2011 · issued Nov 17, 2011 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 03)

    Closed
  • Addition or alteration · Multiple projects

    Revision 2: Proposed alterations to shoring project on north side of new TTC platform.Revision: Proposal for excavation and shoring on north side of new TTC platform. (Phase 6 and Phase 8)Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.

    Applied Jul 7, 2011 · issued Jul 22, 2011 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 02)

    Closed
Show 3 more permits
  • Addition or alteration · Multiple projects

    Revision: Proposal for excavation and shoring on north side of new TTC platform.Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.

    Applied Jun 28, 2011 · issued Jul 12, 2011 · completed Jun 22, 2017 · Permit 09 174823 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.SEE BUILDING PERMIT FILE FOR PLANS

    Applied Oct 1, 2009 · issued Apr 19, 2010 · completed May 31, 2017 · Permit 09 174823 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct new platform on the south side of the existing subway tracks and expand the concourse level. TTC Union Station.

    Applied Oct 1, 2009 · issued Apr 19, 2010 · completed Jun 22, 2017 · Permit 09 174823 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 71 Front St W · Minor variance

    To alter the existing Union Station (railway station) by constructing a new South Platform, Tracks Q and R, Concourse Extension from York Street to Bay Street, and Single Canopy Structure.

    100 m away · filed Dec 12, 2022 · Approved

  • 95 Wellington St W · Minor variance

    To alter the Site-Specific By-law for the 22-storey mixed use building by constructing new vestibule entrances, expanding the retail component on the ground floor, and by constructing a new canopy along the Wellington Street West frontage.

    250 m away · filed Jun 16, 2020 · Approved

  • 200 Bay St · Minor variance

    To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.

    90 m away · filed Feb 5, 2020 · Application withdrawn

  • 141 Bay St · Minor variance

    To alter the development plan approved under Site Specific By-Law 1104-2016 permitting the construction of a 50 storey office building with a seven-storey retail podium by altering the building envelope, podium and parapet height, mechanical penthouse height and roof coverage, parking space quantity and size, and the P1 level vehicular ramp.

    130 m away · filed Oct 31, 2019 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.