Toronto address · Ward 13, Toronto Centre
55 Nicholas Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New building
Proposal to construct 2 blocks of residential buildings with 24 units. See also 17 266912 NB for related development. Part 9 ,Townhouse blocks:as per Emad:
Applied Dec 20, 2017 · issued Aug 31, 2020 · 24 homes added · Permit 17 277955 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct 2 blocks of residential buildings with 24 units. See also 17 266912 NB for related development.
Applied Dec 20, 2017 · issued Aug 31, 2020 · Permit 17 277955 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to construct 2 blocks of residential buildings with 24 units. See also 17 266912 NB for related development.
Applied Dec 20, 2017 · issued Aug 31, 2020 · Permit 17 277955 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
430 homes · Residential
70 m away · Condominium · Under review · filed Nov 4, 2021
- Under review
747-761 Dundas Street East and 2 Mark Street
48 storeys · 1,197 homes · Mixed use
130 m away · Rezoning · Under review · filed Oct 8, 2025
- Approved
591-620 Dundas Street East and 325 Gerrard Street East
Residential
230 m away · Condominium · Approved · filed Jun 22, 2023
- Under appeal
15 storeys · Residential
380 m away · Rezoning · Under appeal · filed May 27, 2021
- Under review
15 storeys · 151 homes · Residential
410 m away · Condominium · Under review · filed Nov 8, 2021
- Approved
35 storeys · 413 homes · Mixed use
490 m away · Rezoning · Approved · filed Feb 27, 2026
Neighbours’ Committee of Adjustment files within 250 m
60 Wascana Ave · Minor variance
To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.
250 m away · filed Jul 22, 2026 · Hearing scheduled
111 River St · Minor variance
To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a t…
70 m away · filed Sep 23, 2025 · Approved
131 River St · Minor variance
To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.
140 m away · filed Sep 12, 2025 · Approved
83 River St · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.
80 m away · filed May 1, 2024 · Approved
41 River St · Minor variance
To alter the existing five-storey mixed-use building containing 26 residential dwelling units and 3 artist studios (on the ground level), by constructing an additional residential dwelling unit within the mechanical penthouse, for a total of 27 residential dwelling units.
200 m away · filed Feb 13, 2024 · Approved
150 River St · Consent
To obtain consent to create two easements/right-of-ways.
210 m away · filed Nov 4, 2021 · Approved
25 Nicholas Ave · Minor variance
To alter the development proposal for a 28-storey mixed-use building including a four to six-storey podium and 24 three-storey back-to-back townhouses by permitting 11 undersized parking spaces.
70 m away · filed Mar 17, 2021 · Approved
591 Dundas St E · Minor variance
To legalize and maintain ten undersized residential parking spaces provided for the 11-storey and 29-storey mixed-use building under construction, of which four parking spaces are located on the P3 parking level, and six parking spaces are located on the P2 parking level.
180 m away · filed Sep 22, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.