Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

30 Whistle Post St

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to convert to 2 unit.

    Applied Aug 9, 2019 · issued Sep 26, 2019 · Permit 19 203215 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Proposal for interior alterations to convert to 2 unit.

    Applied Aug 9, 2019 · issued Sep 26, 2019 · 1 home added · Permit 19 203215 BLD

    Inspections under way
  • Small residential project · Other

    Proposal to install two windows in existing detached garage.

    Applied Jul 14, 2016 · issued Jul 20, 2016 · completed Oct 9, 2025 · Permit 16 190291 BLD

    Cancelled
  • Small residential project · Multiple projects

    Revision to rear 3rd floor balcony glazing.

    Applied Jul 6, 2015 · issued Aug 26, 2015 · Permit 12 219166 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    proposal to enclose 3rd storey balcony and do interior alteration to the ground floor

    Applied Jul 26, 2012 · issued Jul 27, 2012 · Permit 12 219166 BLD

    Inspections under way
  • Small residential project · Deck

    Proposal to cover rear deck. Existing single family dwelling.

    Applied Aug 5, 2011 · issued Aug 10, 2011 · Permit 11 252147 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 8 Dawes Road

    579 homes · Residential

    90 m away · Site plan · Under review · filed Nov 3, 2022

    Under review
  • 9-25 Dawes Road

    33 storeys · 769 homes · Mixed use

    140 m away · Condominium · Under review · filed Oct 28, 2021

    Under review
  • 6 Dawes Road

    37 storeys · 897 homes · Residential

    170 m away · Site plan · Approved · filed Apr 25, 2022

    Approved
  • 10-30 Dawes Road

    38 storeys · 636 homes · Mixed use

    190 m away · Site plan · Approved · filed Aug 10, 2021

    Approved
  • 2721 Danforth Avenue

    55 storeys · 1,139 homes · Mixed use

    250 m away · Subdivision · Under appeal · filed Nov 7, 2021

    Under appeal
  • 2681 Danforth Avenue

    48 storeys · 1,050 homes · Residential

    250 m away · Rezoning · Under appeal · filed Dec 21, 2022

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 6 Dawes Rd · Consent

    To obtain consent to create a new easement/right-of-way. The existing easements/rights-of-way will be maintained and unaltered.

    160 m away · filed Apr 20, 2026 · Approved

  • 40 Crossovers St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition (rooftop deck enclosure) and a partial rear third storey addition (rooftop deck enclosure).

    80 m away · filed Sep 16, 2024 · Approved

  • 10 Dawes Rd · Minor variance

    To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.

    150 m away · filed May 3, 2024 · Approved

  • 9 Dawes Rd · Minor variance

    To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.

    150 m away · filed Nov 7, 2023 · Approved

  • 6 Dawes Rd · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 1176-2022(OLT), which include changes to the overall height, parking standards, and to permit washrooms within the mechanical penthouse, for Phase 1 (West Block) of the development.

    160 m away · filed Jul 19, 2023 · Approved

  • 2295 Gerrard St E · Minor variance

    To construct an ancillary structure (shed) in the rear yard of the property with canopy covered areas (trellis).

    240 m away · filed Oct 25, 2022 · Approved

  • 72 Whistle Post St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front basement entrance and converting the basement into a secondary suite.

    150 m away · filed Apr 11, 2021 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.